If the approved change requests have an effect on the project scope,then the corresponding component documents and cost baselines,and( )of the project management plan are revised and reissued to reflect the approved changes.A.developing baselines B.testing baselines C.schedule base lines D.ending baselines
选项
A.developing baselines
B.testing baselines
C.schedule base lines
D.ending baselines
答案
C
解析
如果批准的变更请求对项目范围的影响,那么相应的组件文件和成本基线,和进度基线的项目管理计划。修订再版反映批准的变更。(75) A.发展基线 B.测试基线 C.进度基线 D.结束基线
转载请注明原文地址:https://www.tihaiku.com/congyezige/2296001.html
本试题收录于:
高级信息系统项目管理师题库软件水平考试初中高级分类
高级信息系统项目管理师
软件水平考试初中高级
相关试题推荐
( )istheapprovedversionofthetime-
ThePerformIntegratedChangeControlpr
hePerformIntegratedChangeControlpro
ThePerformIntegratedChangeControl
ThePerformIntegratedChangeControl
TheperformIntegratedChangeContorlpr
Iftheapprovedchangerequestshavean
Changesmayberequestedbyanystakehol
Iftheapprovedchangerequestshavean
Changesmayberequestedbyanystakehol
随机试题
WhenDidAidsBegin?Theyea
Thecommittee__________aconclusionon
疮疡初起兼有表证应首选()。A.麻黄B.桂枝C.香薷D.荆芥E.防风
A.益母草浸膏B.颅通定C.丹参注射液D.莪术油注射液E.银杏叶提取物临床应用偶
如图是一物体某两个角度的视图,则该物体最可能是: A.如上图所示 B.如上图
编制某居住小区的修建性详细规划,其容积率控制指标为3.5,为妥善处理其较大的容积
人在每一瞬间,将心理活动选择了某些对象而忽略了另一些对象。这一特点指的是注意的(
(2020年真题)企业签订加工承揽合同支付的印花税,应计入加工承揽项目成本中。(
管道工程安装 建筑给水系统设有水箱时,水泵的扬程设置应()。 A.满足最不
以下为水痘皮疹特点,但除A.皮疹呈向心性分布 B.皮疹最初形态为斑丘疹 C.
最新回复
(
0
)