The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to( ).A.measure, delay, record, distribute, analyze, and directB.plan, schedule, monitor, control, report, and forecastC.promote, highlight, monitor, control, forecast, and reportD.emphasize, visualize, analyze, conceptualize, report, and record
选项
A.measure, delay, record, distribute, analyze, and direct
B.plan, schedule, monitor, control, report, and forecast
C.promote, highlight, monitor, control, forecast, and report
D.emphasize, visualize, analyze, conceptualize, report, and record
答案
B
解析
项目计划包括了多个文件,规定了在一段时间内的活动,代表该项目的时间进度,它是一种管理工具,用于决策。因此,项目管理团队使用进度计划于
A、措施、延迟、记录、分发、分析、直接
B、方案、计划、监测、控制、报表、预测
C、促进、突显、监测、控制、预测,报表
D、强调、可视化、分析、概念化、报表、记录
转载请注明原文地址:https://www.tihaiku.com/congyezige/2302230.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Theproject()processesinclude:dev
Inprojecttimemanagement,activitydef
ProjectIntegrationManagementincludes
( )isaprojectmanagementtechniquefo
Toensuretheprojectteamprovidesthe
Ascheduleiscommonlyusedinprojectp
Establishingaproject( )involveslis
TheProjectManagementTriangleisamod
Inprojectmanagement,a( )isalisto
Aprojectmanageriscalledtoaninform
随机试题
Oneofthebasiccharacteristicsofcapitalismistheprivateownershipoft
Vibrationsinthegroundareapoorlyunderstoodbutprobablywidespreadmea
[originaltext]M:Therearejustoneortwomorethings,Catherine.W:Docallm
TheTexasteenBuchananis【1】_____theHarryPotterandtheHalf-BloodPrince
Someyearsago,anAmericanpolicemanfoundawomanlyingnearalonelyroa
A.毒扁豆碱 B.贝那替秦 C.山莨菪碱 D.后马托品 E.新斯的明治疗
(2016年11月)工作描述的内容包括()。A.工作职责 B.工作内容 C
中西文化交相辉映,如汤显祖与莎士比亚是同时代的著名戏剧家,下列属于同时代同一领域
资产负债率和利息保障倍数均属于()指标。A:盈利比率B:杠杆比率C:负债比率
下列关于利息的说法,正确的有()。A.利息是从属于信用的一个经济范畴 B.利
最新回复
(
0
)