首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
61
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Which of the following statements is TRUE according to the passage?
选项
A、To build a structure like the City Hall will cost $2. 5 million today.
B、The clock tower stands parallel with the centre of the City Hall.
C、Old City Hall was once pulled down in the development of the city.
D、Old City Hall is now a historical site.
答案
D
解析
综合分析题。题干问的是“根据文章,下列哪项是正确的?”根据定位句“这相当于今天的5300万美元。”(A项不符);“钟楼与贝街中心点平行,而不是与市政厅的中心平行。”(B项不符);“…老市政厅面临着被拆除的危险。”(C项不符);“老市政厅在1989年被认定为历史遗迹。”(D项符合)。综合分析可知,答案中只有D项是符合文中原义的,故选D。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3366077.html
相关试题推荐
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
WhatistrueaboutTom?[br][originaltext]F:Tomgetsupathalfpastfiveto
患者,女,39岁,2个月前患结核性胸膜炎,经胸腔抽液及异烟肼、利福平、链霉素、吡
下列不属于输出装置的是()。 A、传感器 B、电磁阀 C、电动调节
李老师认为,要让孩子树立自信心,就必须让孩子发现自己的优点,在一次课上,李老师组
在一定生产技术组织条件下,单台设备单位时间的产量标准称为()。A:设备设计定额
属于患者义务的是A.知情同意B.支持医学发展C.患者利益至上D.医德境界E.内心
金融市场的基本要素包括()。A.交易对象 B.交易工具 C.交易主体 D
( )依靠墙体自重抵抗墙后土体侧向推力,是目前城镇道路常用的挡墙形式。A.重力
根据《招标投标法》的规定,达到国家规定的规模标准的工程建设项目的()都必须依法进
A.维拉帕米 B.硝酸甘油 C.地尔硫革 D.普萘洛尔 E.硝苯地平连续
最新回复
(
0
)