首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
35
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Toronto’s third City Hall came into use in______.
选项
A、the 18th century
B、the 19th century
C、the 20th century
D、the 21st century
答案
B
解析
细节题。题干问的是“多伦多第三市政厅在哪一年投入使用?”根据定位句“多伦多第三市政厅…于1899年9月18日开放”可知,市政厅是在1899年投入使用。1899年属于19世纪,故选B。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3366073.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
—Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
Nowcustomhasnotbeencommonlyregardedasasubjectofanygreatimportan
Whatdoestheorganizertellthemembersaboutwhoshoulddoeachofthefollowi
JacksaysthatmanyofyouareaskingaboutthetriptoScotland.Yes!Wear
The______(strong)ofnylonfarexceedsthatofartificialsilk.strength
Peoplewithdisabilitiescomprisealargepartofthepopulation.Itis【C1】_
A.1个月 B.2个月 C.4个月 D.7个月 E.12个月添加鱼肝油的
来源于十字花科植物播娘蒿干燥成熟种子的中药材是A牵牛子 B菟丝子 C南葶苈子
在确定控制测试的性质时,注册会计师的下列做法中,正确的有( )。 A.当拟
简述现代企业人力资源管理各个历史发展阶段的特点。
公路工程施工中,项目经理部应文明施工,在项目部驻地适当位置应设置公示标志,内容包
最新回复
(
0
)