问题
All of followings should be done by the project manager during project control except ().A.Determine the a change has occurredB.Ensure that a change is agreedC.Make sure all changes are approveD.by managementD.Manage changes as they occur
选项
A.Determine the a change has occurred
B.Ensure that a change is agreed
C.Make sure all changes are approveD.by management
D.Manage changes as they occur
答案
B
解析
译文:项目经理不应该在项目控制过程中执行的工作是()。
A)确定变更已经发生
B)确保变更已达成共识
C)确保所有变更都获得管理层批准
D)在变更发生时,对变更进行管理
转载请注明原文地址:https://www.tihaiku.com/congyezige/2299754.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
随机试题
Withthepossibleexceptionofequalrights,perhapsthemost【1】issueacross
Asacontemporaryartist,JimDinehasoftenincorporatedotherpeople’spho
某公司经过改革后,准备使用计算机来参与公司管理,为了让大家了解这种新引进的性质复
教学目标表述的可操作性是要指出实现教学目标的具体途径。()
A.组织面 B.面 C.组织面-磨光面-面 D.磨光面 E.组织面-磨光
临床上用乳胶凝集法检测的类风湿因于指的是:A.IgA型类风湿因子 B.Ig
治疗咳嗽气喘,肠燥便秘,应选用的药物是()A.紫苏子 B.半夏 C.火
Je4A4273反应相间故障的阻抗继电器,采用相电压和相电流的接线方式,其继电
(2021年下半年真题)关于影响人的发展因素问题,曾出现过“生而知之"的"天才论
本部分采取专家阅卷,1~4题,满分100分。请在答题纸上写明题号,用钢笔、圆珠笔
最新回复
(
0
)