问题
All of followings should be done by the project manager during project control except ().A.Determine the a change has occurredB.Ensure that a change is agreedC.Make sure all changes are approveD.by managementD.Manage changes as they occur
选项
A.Determine the a change has occurred
B.Ensure that a change is agreed
C.Make sure all changes are approveD.by management
D.Manage changes as they occur
答案
B
解析
译文:项目经理不应该在项目控制过程中执行的工作是()。
A)确定变更已经发生
B)确保变更已达成共识
C)确保所有变更都获得管理层批准
D)在变更发生时,对变更进行管理
转载请注明原文地址:https://www.tihaiku.com/congyezige/2299754.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
随机试题
Massivechangesinalloftheworld’sdeeplycherishedsportinghabitsare
Toerrishumanandtoforgivedivine,accordingtotheoldadage.Humanswh
Manhasbeenstoringupusefulknowledgeabouthimselfandtheuniverseatther
根据企业所得税的规定,下列说法正确的有()。A.创业投资企业采取股权投资方式投
卡特尔根据对智力测验结果的分析,将处理数字系列、空间视觉感和图形矩阵项目时所需的
由麻醉药品定点经营企业经销,且不得零售的是A.第一类中的非药品类易制毒类化学品
社会工作者要调动社区内外的各种资源,帮助实现资源链接,将其有效地投入到地区发展中
(2021年真题)甲公司为增值税一般纳税人,2018年12月在原值1000万元的
固定式启闭机形式主要有()。A.卷扬式启闭机 B.螺杆式启闭机 C.开式启
哪项不符合硅沉着病的病理变化A.易并发肺结核 B.可引起肺间质纤维化 C.早
最新回复
(
0
)