首页
登录
职称英语
Earthquakes 【M11】At two minutes to noon in S
Earthquakes 【M11】At two minutes to noon in S
游客
2025-04-06
44
管理
问题
Earthquakes
【M11】
At two minutes to noon in September 1 of 1923, the great clock in Tokyo stopped
. 【M12】
Tokyo Bay shook as if huge rug had been pulled from under it
. 【M13】
Towered above the bay, the 4,000 meter Mount Fuji stood above a deep trench in the sea
. 【M14】
It was from this trench where the earthquake came
, at a magnitude of 8. 3 on the Richter scale.
Huge waves swept over the city. 【M15】
Boats were driven inland, and buildings and people were dragged out sea
. 【M16】
The tremors dislodged part of a hillside, which gave way, brushing trains, stations and bodies the water below
. 【M17】
Three massive shocks wrecked the of Tokyo and Yokohama
and, during the next six hours, there were more than 100 aftershocks.
The casualties were enormous, but there were also some lucky survivors. 【M18】
The most remarkably was a woman who was having a bath in her room at the Tokyo Grand Hotel
. 【M19】
As for the hotel collapsed, she and her bath gracefully descended to the street
,【M20】
leave both her and the bath water intact
. [br] 【M13】
选项
答案
Towered改成Towering
解析
本句无被动语意。
转载请注明原文地址:https://www.tihaiku.com/zcyy/4028557.html
相关试题推荐
Tenminuteslater,thepolicecameand______thecrowd.A、dismayedB、dispersedC、d
Earthquakes【M11】AttwominutestonooninS
Earthquakes【M11】AttwominutestonooninS
Earthquakes【M11】AttwominutestonooninS
Earthquakes【M11】AttwominutestonooninS
Earthquakes【M11】AttwominutestonooninS
Earthquakes【M11】AttwominutestonooninS
Earthquakes【M11】AttwominutestonooninS
Thepolice______toemergenciesinjustafewminuteswhentheaccidenthappened.
Untilmeninventedwaysofstayingunderwaterformorethanafewminutes,t
随机试题
Evenachildknowsthatnoddingheadmeans"Yes".ButsomepeopleWouldprob
消化道对水的吸收主要在下列哪些部位进行()A.胃 B.十二指肠 C.大肠
在媒体口中,“哥”和“姐”之类的称谓都有一种非正式的______:既包含某种拉近
根据《水工建筑物地下开挖工程施工技术规范》SL378-2007,下列关于洞室开挖
施工方案对工程进度有直接的影响,在决策选用时,不仅应分析技术的先进性和经济合理性
(2013年真题)商品房现售条件与预售条件的不同之处有()。A.已通过竣工验收
根据《中国期货业协会纪律惩戒程序》的规定,()在申辩过程中应当承担主要举证责任
关于先张法预应力筋张拉操作的说法,错误的是( )。A.锚固横梁须有足够刚度,受力
根据流水施工的分级,群体工程流水施工也称为()。 A.大流水施工B.综合流
女性,38岁。1年来面色苍白伴倦怠、耳呜就诊。化验:RBC2.5×10/L,Hb
最新回复
(
0
)