首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2025-03-03
38
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] Old City Hall was constructed in ______years.
选项
A、3
B、7
C、9
D、11
答案
D
解析
细节题。定位到文章第三段第一句“Lennox took three years to design the City Hall and it took 11 years to build it.”可知,Lennox花了三年时间设计了市政厅,花了11年时间才建成,即市政厅的建设周期长达11年。故选D。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3981367.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
[originaltext]W:Goodafternoon,Mr.Burke.Didyouhaveagoodlunch?M:Yes,
Oursocietyvaluesboysandtheirexperiencemorethanitvaluesgirls,and
Forthispart,youareallowed30minutestouniteanessaycommentingonthesa
Ithinkalotabouttimeandnotjustbecauseit’sthenameofthenewsorga
一妇女婚后两年同居未孕,月经规律,末次月经后20天出现阴道淋漓出血半月余,曾用止
针对某社区老年活动室存在日常管理松懈、使用率偏低等问题,社会工作者小刘拟通过动员
港口工程勘察中,在深度15m处有一层厚度4m并处于地下水位以下的粉砂层。实测标准
根据社会保险法律制度的规定,下列人员中,属于工伤保险覆盖范围的有()。A.律师
隧道超欠挖测定方法有()。A.利用激光束测定 B.用全站仪测定 C.用
地面工程整体面层施工完毕后,养护时间不应小于7d;抗压强度应达到( )后,方准
最新回复
(
0
)