首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2025-03-03
45
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Toronto’s third City Hall came into use in______.
选项
A、the 18th century
B、the 19th century
C、the 20th century
D、the 21st century
答案
B
解析
细节题。题干问的是“多伦多第三市政厅在哪一年投入使用?”根据定位句“多伦多第三市政厅…于1899年9月18日开放”可知,市政厅是在1899年投入使用。1899年属于19世纪,故选B。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3980635.html
相关试题推荐
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
[originaltext]M:Ireallyappreciateyourfillingmeinonyesterday’slecture.
Theymayappeartobemarvelsofmodernscience.Buttheideasthatledtot
[originaltext]M:ItseemsthateachtimeIcometothisrestaurantthepriceof
商业银行办理个人储蓄存款业务应当遵循的原则有()。A.存款自愿 B.取款自由
根据《水电建设工程质量管理暂行办法》,下列属于项目法人职责的是()。A、工程建设
以下不属于意识障碍表现形式的是A.谵妄B.痴呆C.精神错乱D.昏睡E.昏迷
认为政府管制为被管制者留下了“猫鼠追逐”余地的理论是()。A.特殊利益论 B.
(2017年真题)根据民事法律制度的规定,下列关于诉讼时效期间起算的表述中,正确
A.一类先天遗传异常所致的反应 B.突然停药后原有疾病加剧 C.停药后血药浓
下列选项中,不属于资产负债表列示项目的是()。A、库存现金 B、待处理财产损溢
最新回复
(
0
)