首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2025-03-03
41
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $ 3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。定位到文章第二段第五句“They also say the pipeline could pollute their main water source,the Missouri River.”可知,他们认为这条管道可能会污染当地的主要水源——密苏里河,所以印第安人反对管道建设的一个原因是担心管道会污染水源一。A选项“因为工程耗资达38亿”,不是印第安人抗议的原因;C选项“因为很多人会因此而失业”和D选项“这将迫使很多人离开家园”均未在文中提及。故选B。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3981358.html
相关试题推荐
He______havecompletedhiswork;otherwise,hewouldn’tbeenjoyinghimselfby
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
随机试题
Ifthereisanysingle【21】thatmakesforsuccessinliving,itistheabilit
技术分析法是对市场以外影响市场价格的因素进行研究来预测市场价格变动方向的方法。()A、正确B、错误B技术分析法是通过对市场行为本身的分析来预测市场价
施工完成的雨污水管道在回填前应该按照设计及规范要求进行闭水试验,试验结果由()
引起中药散气变味的主要因素是A.温度 B.湿度 C.成分 D.空气 E.
网路图中的关键路线是指()。A:总时差和自由时差相等的线路 B:时标网路图上
下列各项中,纳税人不可以提出行政复议的是( )。A、税务机关作出的强制执行措施
书籍:装帧A.策划:设计 B.粉刷:油漆 C.服装:熨烫 D.理发:美容
城市规划中社会调查所用到的相关数据、资料的种类大体上包括()。A.基础数据
先由参保人自付一定比例后,再按基本医疗保险规定的分担办法支付的是A.《国家非处方
A.苦杏仁、苏子 B.百部、马兜铃 C.桑白皮、葶苈子 D.白果、枇杷叶
最新回复
(
0
)