问题
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe(部落), is determined to stop the 1,172-mile pipeline from being built. (76)
Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
(77)
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
[br] Which of the following is the main idea of the passage?
选项
A、The Dakota Access Pipeline will create more markets for oil and gas.
B、The Dakota Access Pipeline will create many job opportunities.
C、American Indians oppose the construction of an oil pipeline.
D、American Indians fight for equal voting rights.
答案
C
解析
主旨题。题干问的是“下列哪项表达了本文的大意?”根据定位句第一句“ETP公司期望在今年内完成输油管道建设”,第三句“立岩苏族决定要中止1172英里长的输油管道的修建”,第四句“双方都没有妥协的迹象”可知双方矛盾所在。A项“达科塔输油管道将为原油和天然气创造更多市场”;B项“达科塔输油管道将创造更多就业机会”;D项“美国印第安人为平等投票权而战”在文中均没有提及。故选C。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3980625.html
相关试题推荐
He______havecompletedhiswork;otherwise,hewouldn’tbeenjoyinghimselfby
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
随机试题
[originaltext]W:I’vejustfinishedreadingSteve’slistofwaysofmotivating
胰岛素治疗的适应证有哪些?
下列对滤过除菌法论述错误的是A.在滤除细菌的同时可以除去一些微粒杂质 B.
5、一张工作票上所列的检修设备应同时停、送电,开工前工作票内的全部安全措施应__
目前,用户在使用个人征信系统查询个人信用报告时,需要支付一定费用。()
下列各项中,属于平衡计分卡内部业务流程维度业绩评价指标的有()。A.息税前
LC咖啡充分利用移动互联网和大数据技术的新零售模式,为客户提供覆盖食品、饮品和快
监理企业质量管理体系的中,项目总监理工程师属于监理单位的( )。A.决策层
下列各选项中,属施工现场防火制度范畴的是()。A.建立动用明火审批制度 B.建
关于网络计划线路的说法,正确的是( )A.线路可依次用该线路上的节点代号来表示