首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-03-03
39
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, to check and to collect them when people leave the trains. This is all different of the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot send no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. If one train stays too long at a station, the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、It will stop automatically.
B、It will move on at the same speed.
C、It will gradually slow down.
D、It will keep a safe distance from the other trains.
答案
A
解析
[听力原文]
If no signal is sent from the command spot, what will happen to the train?
由选项推测本题考查it发出的动作。本题关键句为“If the command spot send no signals,the train will stop”,如果控制台没有信号列车将停止,故正确答案为A)。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3502188.html
相关试题推荐
[originaltext]Smartphonesdistractattentionandreducelearningbecauseof
[originaltext]Goodafternoon.Intoday’slecture,we’llbetalkingaboutho
[originaltext]Goodafternoon.Intoday’slecture,we’llbetalkingaboutho
[originaltext]Goodafternoon.Intoday’slecture,we’llbetalkingaboutho
[originaltext]InAmerica,mostresearchersconcedethatboysandgirlsare
[originaltext]Everyoneissupposedtocheerforgoodguys,andweshouldon
[originaltext]Everyoneissupposedtocheerforgoodguys,andweshouldon
[originaltext]Everyoneissupposedtocheerforgoodguys,andweshouldon
[originaltext]Anewstudyhasfoundapositivecorrelationbetweenhowmuch
[originaltext]Anewstudyhasfoundapositivecorrelationbetweenhowmuch
随机试题
Thesystemofflexibleworkingtimeisdesignedforthoseemployeeswhosejobsd
HLB值
绘制室内给水排水工程图,一般是先绘制其平面图,然后绘制系统图,最后绘制()。A
交通行业标准《公路桥梁板式橡胶支座》规定:桥梁板式橡胶支座实测抗压弹性模量应满足
A.心尖区舒张中晚期隆隆样杂音 B.心尖区全收缩期吹风样杂音 C.胸骨左缘第
关于控制性详细规划的控制体系的规定性指标,下列说法错误的是( )。A.建筑密度即
根据“虚则补其母”确立的治法是A.培土制水法 B.益火补土法 C.滋水涵木法
?道?琼斯平均指数由()创立。A.查尔斯?亨利?道 B.菲波纳奇 C.艾略
听觉具有音调、响度和音色三种特性,这些特性主要受声波的振幅、波形和频率等物理学
建设工程进度控制是监理工程师的主要任务之一,其最终目的是确保建设项目()。A.在
最新回复
(
0
)