首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-07
35
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 6, Para. 3)means______.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
含义题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings.可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3429456.html
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
随机试题
(frighten)______bytheexplosion,thecrowdscatteredimmediately.Frightened由于
WhyisthewomaninterestedinworkingwithProfessorSmith?[br][originaltext
TheQinghai-TibetRailwaywascompletedandbeganoperatingonJuly1,2006.
胃分泌的内因子不足时,则( )的吸收不良,影响红细胞的生成,造成巨幼红细胞性贫
下列关于麻醉药品和第一类精神药品的使用单味麻精药品储存的说法不正确的是A.专库
提高能源使用效率、鼓励能源灵活利用是英国减少温室气体排放政策的一个必要环节,它需
某公司是一家新建企业,为了打好管理基础,保证产品质量,公司决定从全员质量教育工
磨牙的叙述,错误的是A.第一磨牙萌出早,沟裂点隙多,容易龋坏 B.第二乳磨牙形
背景:某机电安装工程公司通过公开招标承接了一小区机电工程总承包项目,中标价800
根据《水利工程建设项目施工监理规范》(SL288-2014)监理单位对混凝土质量
最新回复
(
0
)