首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-07
30
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 6, Para. 3)means______.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
含义题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings.可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3429456.html
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
随机试题
Therehasbeenanincreasein______numberofpeoplelookingfor______work.A、/;t
TennisstarChrisEvert,whoretiredfromthegameaftereighteenyears,perhaps
Wehumanbeingsarelandanimals,butwearealsocloselytiedtothesea.T
《中共中央国务院关于进一步加强和改进大学生思想政治教育的意见》指出,学工部长、辅
商品名通过注册后称为()A.法定名 B.商品名 C.国际非专利名
西方国家体现出的体育人文精神是()。A.天人合一 B.崇尚和谐 C.恪守中
合理的进度计划应体现资源的合理使用、工作面的合理安排、有利于提高建设质量、有利于
(2019年真题)下列现金收支业务中,属于“经营活动产生的现金流量"的是()。
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
初期处理火器伤清创后伤口应作一期缝合的是A.臀部 B.下肢 C.膝关节腔
最新回复
(
0
)