首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2024-01-14
33
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1, 172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] According to the passage, which of the following statements is NOT TRUE?
选项
A、This pipeline will cross four states.
B、This pipeline is 1, 172 miles long.
C、All the protesters are from the Standing Rock Sioux.
D、Neither side of the dispute is willing to compromise.
答案
C
解析
综合分析题。根据第一段第一句可知A选项“这条输油管道将跨越四个州进行输送。”表述正确;根据第一段第三句可知B选项“立岩苏族决定要中止1172英里长的输油管道的修建”表述正确;根据第二段最后一句可知,此后,几千人,包括美国其他印第安部落的人们纷纷加入抗议大军,C选项表述错误;根据第一段最后一句可知D选项“双方都没有表示妥协的迹象。”表述正确。故选C。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3362808.html
相关试题推荐
Thecloudshadspreadandnearly______theentiresky.A、separatedB、hiddenC、bloc
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Newspapersarenotnearlyaspopulartodayastleywereinthepast.There
Newspapersarenotnearlyaspopulartodayastleywereinthepast.There
Ifyouareamemberofaclub,youmust______totherulesofthatclub.A、access
Theytoldmeitwouldbecheapbut_______itcostmenearly$500.A、ingeneralB、
W:Theexperimenthasbeencompleted,hasn’tit?M:______A、Yes.Weneedanother
随机试题
[originaltext]M:I’mterriblysorryI’vebrokenyourcup.I’llbuyyouanewon
与组织日常的、例行的运营工作不同,项目具有些非常明显的特点。"没有完全一样的项目
光源在单位时间内发出的能被人眼感知的光辐射能的大小是()。A.光谱光效率 B
关于胆总管下列说法正确的是()。A.由左、右肝管汇合而成 B.由肝总管和胆囊
根据《建设工程项目管理规范》68/T50326--2006,项目管理实施规划应
当前城乡二元体制仍然存在,不过,现在的城乡二元体制中,限制农民进城的体制机制障碍
在公司制企业中,作为股东会议的常设权力机构,代表股东利益进行重大决策的是()。A
下列情形不可以申请公积金个人住房贷款的是()。A.装修自有住房 B.购
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
项目可行性研究中风险分析的编制内容不包括()。A.风险因素的识别 B.风险程
最新回复
(
0
)