the ( ) is primarily concerned with acceptance of the deliverables.while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverables.A.verify scopeB.define scopeC.quality assuranceD.validate scope
选项
答案
A
解析
翻译:验证范围主要涉及的交付验收。而质量控制主要关注的是项目可交付成果的正确性和满足规定的质量要求交付。A.验证范围 B.定义范围 C.质量保证 D.确认范围
转载请注明原文地址:https://www.tihaiku.com/congyezige/2301322.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
()isnotprimarilyusedtoprotectth
( )isprimarilyconcernedwithdefining
()isprimarilyconcernedwithdefining
the()isprimarilyconcernedwithacce
Projectsuccessdependsprimarilyon()。
()isprimarilyconcernedwithdefining
The()isprimarilyconcernedwithacc
the()isprimarilyconcernedwithac
()isprimarilyconcernedwithdefining
随机试题
WilliamPenn,thefounderofPennsylvania,______defendedtherightofeveryci
为完成相同运量而有四个不同的投资方案,各方案投资金额现值和项目投产后净现值如下表
水泥颗粒越细,水化作用的发展就越迅速而充分,使凝结硬化的速度加快,早期强度也就越
分部工程和单位工程应按照投资额比重确定相应的评分值。
下列关于企业价值估值的特点的说法,错误的是()。A.整体即是各部分的简单相加
患者脑震荡入院,呈睡眠状态,可唤醒,醒后可回答问题,但反应迟钝,其意识状态为A.
A.重量差异检查 B.溶出度检查 C.装量差异检查 D.含量均匀度检查
患者,男性,30岁。近2个月来右腰部有隐痛、钝痛。今晨7时突然发作阵发性刀割样疼
某上市公司项目经理赵先生,2020年度中,1~5月由于身体原因在家休息,自6月重
动、静脉穿刺术注意事项
最新回复
(
0
)