( ) must be between on-line deployment and final acceptance.A. Detailed design B.Test run C.Internal testing D.Contract signing
选项
A. Detailed design
B.Test run
C.Internal testing
D.Contract signing
答案
B
解析
翻译:
一定是处于上线部署和最终验收之间。
A.详细设计 B.试运行 C.内部测试 D. 合同的签订
转载请注明原文地址:https://www.tihaiku.com/congyezige/2296005.html
本试题收录于:
高级信息系统项目管理师题库软件水平考试初中高级分类
高级信息系统项目管理师
软件水平考试初中高级
相关试题推荐
质量功能部署(QualityFunctionDeployment,QFD)将
Theconnectionbetweentwonetworkstof
()mustbebetweenon-linedeploymenta
Theconnectionbetweentwonetworkstof
ThedifferencevaluebetweenBudgetedCo
随机试题
Whenadiseaseofepidemicproportionsripsintothepopulace,scientistsim
Mostpeoplewhotravellongdistancescomplainofjetlag(飞行时差反应).Jetlagma
HowtoDoBasicFirstAid1.Method1:PerformingthethreeCsCheckthe【T1】
Complainingaboutfaultygoodsorbadserviceisnevereasy.Firstofall,c
A.改变药性 B.缓和药性 C.降低毒性 D.矫臭矫味 E.增强疗效斑蝥
成年人血细胞生成的主要部位是A.卵黄囊 B.淋巴结 C.红骨髓 D.肝
我国负责制修订知识产权、传统知识、组织知识等领域的国家标准以及负责国际知识管理标
关于固结灌浆施工工艺及技术要求,下列说法错误的有( )。A.灌浆孔的施工按分序
企业期末各项原材料、包装物、在途物资、周转材料、工程物资都需要列示在“存货”项目
利用概算定额编制单位工程概算的工作有:①计算单位工程的人、料、机费用;②列出分项
最新回复
(
0
)