首页
登录
职称英语
Contract No. : CB
Contract No. : CB
游客
2025-06-18
15
管理
问题
Contract No. : CB2009-0054
Date: July 15th, 2009
Sign at: Hongkong
The Buyers: J.B. Lawson & Company Inc.
854 California Street, San Francisco, California, U.S.A. CA94194
The Sellers: Far East Light Industrial Products Imp. & Exp. Corp.
82 Dung Street, Hongkong, P.R.C. 665532
This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated below:
Commodity Descriptions: Canvas Folding Chairs with Wooden Frame
(light-cream wood, dark-green canvas)
Quantity: 500,000 pieces
Unit price: $ 35/piece
Total Value: $ 17,500,000(Seventeen Million and Five Hundred Thousand US Dollars only)
Packing: In strong cartons
Country of Origin: P. R. C
Payment: By 100% Confirmed, Irrevocable, Transferable and Divisible Letter of Credit to be available by sight draft and to remain valid for negotiation in P. R. C until the 15th day after the aforesaid time of shipment.
Insurance: To be covered by the buyer.
Time of Shipment: August, 2009 Port of Lading: Shenzhen, P.R.C
Port of Destination: San Francisco, U.S.
The Buyers: Lily Brown
The Sellers: Huang Jun
Claims:
Within 45 days after the arrival of the goods at the destination, should the quality, specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable. The Buyers shall, have the right on the strength of the inspection certificate issued by the C. C. I. C and the relative documents to claim for compensation to the Sellers.
Force Majeure:
The sellers shall not be held responsible for the delay in shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit.
Arbitration:
All disputes in connection with the execution of this Contract shall be settled friendly through negotiation. In case no settlement can be reached, the case then may be submitted for arbitration to the Arbitration Commission of the China Council for the Promotion of International Trade. [br] Which statement is true according to the passage?
选项
A、The insurance is going to be covered by the seller.
B、The goods is required to be shipped in August.
C、All the commodities will be packed in strong plastic box.
D、The goods will be shipped from Port of Hongkong to San Francisco directly.
答案
B
解析
合同中写道“Time of Shipment:August,2009”,可知正确项是(B)。
转载请注明原文地址:https://www.tihaiku.com/zcyy/4124357.html
相关试题推荐
Afterre-evaluatingtheproposal,theagency______thecontracttous.A、awardin
ContractNo.:CB
ContractNo.:CB
Theminimumtermofyourcontractwithuswillbe______aperiodoftwoyears,wi
Thebuildingownerhas_______itslistofpotentialcontractorstothosewhoseb
Onsigningthemultimillion-eurocontract,thechiefexecutiveofficerwasassur
Theapplicantswhomeetthe_____forthepositionwillbecontractedinorderto
Becauseitwouldgeneratealotofmoney,the_____towinthecontractwilllikel
From:StephanieDruganTo:AmaniRois,GeneralContractorHiAmani,Asreque
From:StephanieDruganTo:AmaniRois,GeneralContractorHiAmani,Asreque
随机试题
TheBeautyAdvantageMostofushaveheardthes
Inthe1920sAmericaenjoyedwhatwastobecomeknownas"anAgeofExcess".
Thespeakerattemptedtoexplainitinsuchawaythatitwouldbe______toanou
2018年1月1日,甲公司购入某公司于当日发行的面值为500万元的债券,实际支付
既能治疗热毒疮疡,又能治疗风热外感的药物是A.金银花 B.黄连 C.桑叶
A.囊尾蚴 B.囊蚴 C.尾蚴 D.六钩蚴 E.裂头蚴脑血吸虫病的病原体
乳腺癌根治术后,为减少和避免术后积液,尽快恢复患侧上肢功能锻炼开始的时间正确是的
A.常规根管治疗 B.一次性根充 C.盖髓治疗 D.干髓术
下列所得中,免征个人所得税的是()。A:加班工资B:年终奖C:残疾人员所得
在完全竞争要素市场上,生产者边际要素成本曲线,平均要素成本和要素供给曲线的关系是
最新回复
(
0
)