The city council of Manchester is about to commence some road expansion work on

游客2025-06-11  2

问题 The city council of Manchester is about to commence some road expansion work on Bradford Street adjacent to Manchester Stadium. This construction project【K9】______ of widening the two lanes of Bradford Street so that it can become a six-lane roadway. 【K10】______
To enable the construction to be【K11】______ safely, Bradford Street will be closed to vehicular traffic between Manchester Stadium and the Museum of Science & Industry. The footbridge next to Manchester Stadium that leads onto Bradford Street will also be shut to pedestrians.
The pedestrian footway along Bradford Street that provides access to Manchester Stadium will not be affected by the work. However, during this period, the buses that normally use Bradford Street will be diverted【K12】______ Little Stoke Lane. [br] 【K11】

选项 A、completed
B、intensified
C、occurred
D、undertaken

答案 D

解析 空格前是意为“建筑,建造;制造”的construction,空格后是意为“安全地”的副词safely。因此需要构成“以安全地着手/实施工程”的意思的词汇,空格处要填undertaken。顺便掌握一下“enable A to B(使A能够B)”结构的用法。
转载请注明原文地址:https://www.tihaiku.com/zcyy/4114052.html
最新回复(0)