首页
登录
职称英语
You will hear a recording that a training manager has made for his assistant, de
You will hear a recording that a training manager has made for his assistant, de
游客
2025-06-01
4
管理
问题
You will hear a recording that a training manager has made for his assistant, describing plans for a training day that he will be running with his colleague, Julia.
As you listen, for questions 1-12, complete the notes using up to three words or a number.
After you have listened once, replay the recording.
TRAINING DAY FOR STANDFORD’S
THINGSTO DO
Ring Swan Hotel, request【L1】______(in addition to other equipment booked).
Cancel【L2】______
Remind participants to bring the【L3】______they’ve received to the training day.
Tell Standford’s that the title of the talk by the guest speaker is now【L4】’______’.
PROGRAMME
Morning
9.15: Talk on: The value of【L5】______in business
10.00: Workshop: 【L6】______
11.15: Discussion: 【L7】’______’
12.00: Role play: 【L8】______
1.00: Lunch
Afternoon
2.00: Session: 【L9】______
3.15: Either
Presentation: 【L10】’______’
or
Workshop: 【L11】’______’
4.00: 【L12】______
5.00: Finish [br] 【L11】
Part One. Questions 1 to 12.
You will hear a recording that a training manager has made for his assistant, describing plans for a training day that he will be running with his colleague, Julia.
As you listen, for questions 1 to 12, complete the notes, using up to three words or a number.
After you have listened once, replay the recording. You now have 45 seconds to read through the notes.
[pause]
Now listen, and complete the notes.
[pause]
I hope you don’t mind me leaving a recording, but something has cropped up and Julia and I have had to go off to head office, so we can’t speak to you in person. We’ve finalised our plans for the management training day we’re putting on for Standford’s on the seventeenth of next month, so could you take the necessary action, please.
The most urgent thing is to contact the venue, that’s the Swan Hotel, and get them to provide a camcorder as well as the video recorder and TV we’ve already booked, as ours isn’t working and I don’t think we can get it fixed in time. And at the same time, because we’ve rethought how to run the first workshop, we won’t be needing the OHPs after all, so you might as well cancel those.
Oh, and when you send the programme to the participants, could you point out that the case study we’ve already circulated to them is for the discussion slot: otherwise I’m sure half of them will forget to take it with them.
Then you’d better ring Standford’s, and tell them that the guest speaker has agreed to change her topic to ’Benefits from coaching’: we managed to persuade her that ’Financial instruments’ would be too heavy for the end of the day!
Right, now we’ve finalised the programme, so could you get it typed up? Here’s the running order. It’s a nine o’clock start and naturally, we’ll introduce ourselves and outline the programme. It’ll be a good idea for us to make everybody really alert as a priority, so at nine fifteen we’re starting with my talk on physical fitness, which is about its importance at work. The payoff is that Julia can take over at ten and do her session on team motivation - that’ll be a workshop format.
Now that’ll take us to a mid-morning break at ten forty-five. I don’t think they should have too long, as we don’t want to lose momentum. The obvious thing to follow the break is the discussion session, which we’re calling ’Performance Improvement’, because it’s an extension and application of what Julia will have been talking about before the coffee break, and should provide food for thought. By the time that’s over, at twelve o’clock, some of them will be beginning to lose concentration before lunch, and we should end the morning with a role play. This went so well last time. It’ll be focusing on negotiating strategies. It should make an interesting session.
I think that’ll leave them in a positive frame of mind for lunch at about one. Julia will start the afternoon at two with her session on troubleshooting. I’m sure participants will come up with plenty of questions about that. Then at three fifteen, we’ve got the two parallel sessions.
They can choose the presentation ’Management Models’, which will be aimed mostly at the less experienced participants, but there’ll be a workshop at the same time on ’Succession Planning’, which might appeal mostly to more senior managers. It’s something that too few companies think about until it’s too late. Then at four o’clock, we’ll bring everyone together for the keynote speech. We thought of setting aside a time for questions and answers, but quite honestly they’ve got most of the day for that, so we won’t bother.
OK, that’s all, so if you could deal with that today or tomorrow, I’d be most grateful.
选项
答案
SUCCESSION PLANNING
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/4098974.html
相关试题推荐
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearfiveseniormanagerstalkingaboutwhytheircompaniesselectedne
随机试题
[originaltext]Requestingsomeone’sbusinesscardisastraightforwardproce
某集团承建一住宅项目,该项目位于居民密集区域,总建筑面积30000m2,地上16
主要感染在成年后,通过性传播,或新生儿围产期在宫内或产道感染的是(单纯疱疹病毒的
()是为投资额较大的个人投资者和机构投资者提供的最具个性化的服务。A、电话服务
坝基渗透水压力不仅会在坝基岩体中形成巨大的扬压力,促使岩体滑动,还会降低岩石强度
当信用创造主要表现在对银行券的发行,以及为商业银行的信用创造提供相应条件的时候,
奥苏伯尔根据学习材料与学习者原有知识结构的关系把学习分为()与(
关于工作分析时使用的问卷调查法的说法,错误的是( )。A.可以在短时间内收集到
某商场2×18年元旦期间进行促销,规定购物每满100元积10分,每个积分可在次月
男性患者,68岁,因饮酒后排尿困难急诊入院;体检见耻骨上包块,有轻压痛。 [问
最新回复
(
0
)