首页
登录
职称英语
You will hear a recording that a training manager has made for his assistant, de
You will hear a recording that a training manager has made for his assistant, de
游客
2025-06-01
4
管理
问题
You will hear a recording that a training manager has made for his assistant, describing plans for a training day that he will be running with his colleague, Julia.
As you listen, for questions 1-12, complete the notes using up to three words or a number.
After you have listened once, replay the recording.
TRAINING DAY FOR STANDFORD’S
THINGSTO DO
Ring Swan Hotel, request【L1】______(in addition to other equipment booked).
Cancel【L2】______
Remind participants to bring the【L3】______they’ve received to the training day.
Tell Standford’s that the title of the talk by the guest speaker is now【L4】’______’.
PROGRAMME
Morning
9.15: Talk on: The value of【L5】______in business
10.00: Workshop: 【L6】______
11.15: Discussion: 【L7】’______’
12.00: Role play: 【L8】______
1.00: Lunch
Afternoon
2.00: Session: 【L9】______
3.15: Either
Presentation: 【L10】’______’
or
Workshop: 【L11】’______’
4.00: 【L12】______
5.00: Finish [br] 【L3】
Part One. Questions 1 to 12.
You will hear a recording that a training manager has made for his assistant, describing plans for a training day that he will be running with his colleague, Julia.
As you listen, for questions 1 to 12, complete the notes, using up to three words or a number.
After you have listened once, replay the recording. You now have 45 seconds to read through the notes.
[pause]
Now listen, and complete the notes.
[pause]
I hope you don’t mind me leaving a recording, but something has cropped up and Julia and I have had to go off to head office, so we can’t speak to you in person. We’ve finalised our plans for the management training day we’re putting on for Standford’s on the seventeenth of next month, so could you take the necessary action, please.
The most urgent thing is to contact the venue, that’s the Swan Hotel, and get them to provide a camcorder as well as the video recorder and TV we’ve already booked, as ours isn’t working and I don’t think we can get it fixed in time. And at the same time, because we’ve rethought how to run the first workshop, we won’t be needing the OHPs after all, so you might as well cancel those.
Oh, and when you send the programme to the participants, could you point out that the case study we’ve already circulated to them is for the discussion slot: otherwise I’m sure half of them will forget to take it with them.
Then you’d better ring Standford’s, and tell them that the guest speaker has agreed to change her topic to ’Benefits from coaching’: we managed to persuade her that ’Financial instruments’ would be too heavy for the end of the day!
Right, now we’ve finalised the programme, so could you get it typed up? Here’s the running order. It’s a nine o’clock start and naturally, we’ll introduce ourselves and outline the programme. It’ll be a good idea for us to make everybody really alert as a priority, so at nine fifteen we’re starting with my talk on physical fitness, which is about its importance at work. The payoff is that Julia can take over at ten and do her session on team motivation - that’ll be a workshop format.
Now that’ll take us to a mid-morning break at ten forty-five. I don’t think they should have too long, as we don’t want to lose momentum. The obvious thing to follow the break is the discussion session, which we’re calling ’Performance Improvement’, because it’s an extension and application of what Julia will have been talking about before the coffee break, and should provide food for thought. By the time that’s over, at twelve o’clock, some of them will be beginning to lose concentration before lunch, and we should end the morning with a role play. This went so well last time. It’ll be focusing on negotiating strategies. It should make an interesting session.
I think that’ll leave them in a positive frame of mind for lunch at about one. Julia will start the afternoon at two with her session on troubleshooting. I’m sure participants will come up with plenty of questions about that. Then at three fifteen, we’ve got the two parallel sessions.
They can choose the presentation ’Management Models’, which will be aimed mostly at the less experienced participants, but there’ll be a workshop at the same time on ’Succession Planning’, which might appeal mostly to more senior managers. It’s something that too few companies think about until it’s too late. Then at four o’clock, we’ll bring everyone together for the keynote speech. We thought of setting aside a time for questions and answers, but quite honestly they’ve got most of the day for that, so we won’t bother.
OK, that’s all, so if you could deal with that today or tomorrow, I’d be most grateful.
选项
答案
CASE STUDIES / CASE STUDY (MATERIALS / PAPERS / DOCUMENTS
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/4098966.html
相关试题推荐
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearfiveseniormanagerstalkingaboutwhytheircompaniesselectedne
Youwillhearfiveseniormanagerstalkingaboutwhytheircompaniesselectedne
Youwillhearfiveseniormanagerstalkingaboutwhytheircompaniesselectedne
Youwillhearfiveseniormanagerstalkingaboutwhytheircompaniesselectedne
随机试题
[originaltext]Cairoisknownforitsovercrowdedroads,irregulardrivingpr
下列关于项目实施与控制的说法,正确的有()。A.项目控制是属于目标控制的范畴
力学强度是水泥和水泥混凝土材料一项重要性能指标,下表列出水泥胶砂和水泥混凝土各一
依据《公路工程质量检验评定标准第一册土建工程》(JTGF80/1-2017)的规
关于进度计划调整的说法,正确的是()。A、网络计划中某项工作进度超前,不需要进
乙脑病毒主要侵犯的人体系统是()。A.免疫系统 B.呼吸系统 C.循环系统
()年,国务院颁布《减持国有股筹集社会保障资金管理暂行办法》。通过国有股变现解决
按照《证券投资基金销售管理办法》,下列可以作为基金代理销售资格的机构有()。A
在选择380V低压配电设备时,下列哪项不能作为功能性开关电器?()A.接触器
(2019年真题)使用承租的机械设备和施工机具及配件的,由()共同进行验收。A
最新回复
(
0
)