首页
登录
职称英语
•Read the article below about improvements.•Choose the correct word or phrase t
•Read the article below about improvements.•Choose the correct word or phrase t
游客
2025-05-30
16
管理
问题
•Read the article below about improvements.
•Choose the correct word or phrase to fill each gap from A, B, C, or D.
•For each question 21—30, mark one letter (A, B, C, or D) on your Answer Sheet.
Are Improvements Worth Paying for?
As goods and services improved, people were persuaded to spend their money in changing from old to new, and found the change worth the expense. When an airline equipped itself with jets, for example, its costs and therefore airfares would go up , but the new planes meant such an improvement that the higher cost was justified. A new car or wireless washing machine, electric kettle made life so much more comfortable than the old one that the high cost of replacement was amply (21) . Manufacturers still cry their wares as persuasively as (22) but are the improvements really worth paying for? In many fields things have now reached such a high standard of performance that (23) progress is very limited and very, very expensive. Airlines, for example, go to enormous expense (24) buying the latest prestige jets, in which vast research costs have been (25) on relatively small improvements. If we scrape these vast costs we might lose the chance of paring minutes (26) flying times; but wouldn’t it be better to see air fares drop dramatically, as capital costs become relatively insignificant? Again, in the context of a 70 m.p.h, limit, with platoons of cars traveling so densely (27) control each other’s speeds, improvements in performance are virtually irrelevant. Small improvements here are unlikely to be worth the thousands anybody replacing a(an) (28) family car every two years may ultimately have spent on them. Let us (29) have cars—or wirelesses, electric kettles, washing machines, light bulbs—which are made to last, and not made to be replaced. Significant progress is obviously a good thing; but the insignificant (30) from model-change to model-change is not. [br]
选项
A、project
B、process
C、progression
D、procedure
答案
C
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/4096404.html
相关试题推荐
TaskTwo—ProductdescriptionForQuestions18-22,choosethedescriptiontha
TaskTwo—ProductdescriptionForQuestions18-22,choosethedescriptiontha
TaskTwo—ProductdescriptionForQuestions18-22,choosethedescriptiontha
Aninternationalbusinessmagazinerecentlypublishedanarticleaboutyourc
Thepurposeofany【C1】______interviewistochoosetherightpersonfort
Thepurposeofany【C1】______interviewistochoosetherightpersonfort
Thepurposeofany【C1】______interviewistochoosetherightpersonfort
•Readthearticleaboutinternationalauditingstandards.•Foreachquestion3
•Readthearticleaboutinternationalauditingstandards.•Foreachquestion3
•Readthearticleaboutinternationalauditingstandards.•Foreachquestion3
随机试题
天柱县位于贵州省东部,是川渝黔通两广、江浙的重要门户,素有“黔东第一关”“中国重晶石之乡”“贵州高原黄金县”之称。天柱县总面积2201平方千米
ThefloodofwomenintothejobmarketboostedeconomicgrowthandchangedU
CoastAlonginUnspoiltTurkey(Ⅰ)畅游在原始的土耳其(Ⅰ)Turkey’sBodrump
[originaltext]W:Hello,Peter.Igreatlyregret-thatIcouldn’tgotoyourpar
患者,男,48岁。突发昏迷,四肢瘫痪,双侧瞳孔针尖样缩小,最可能的诊断是A.额叶
选择器官移植受者的首位标准是()A.受者未来可能的贡献 B.受者在家庭
睡前服用,可使抑制肝脏合成胆固醇效果更好的药品是A.复方铝酸铋片 B.二甲双胍
某企业从生产商订购一台设备,并通过某商业银行向生产商汇款50万人民币,体现了商业
投标保证金可以使用支票、银行汇票等,一般不得超过项目估算价的( )。A.1%
初步施工总进度计划编制完成后,检查总工期是否符合要求,其调整的主要方法有( )
最新回复
(
0
)