首页
登录
职称英语
The floods did not start to_____until two days after the rain had stopped.A、reti
The floods did not start to_____until two days after the rain had stopped.A、reti
游客
2025-04-09
27
管理
问题
The floods did not start to_____until two days after the rain had stopped.
选项
A、retire
B、recede
C、retreat
D、sink
答案
B
解析
句意是:直到雨停了两天以后,洪水才开始退下去。tire指人、军队等“退职,退位,退休,退役”;Retreat指军队“撤退”,回避;Recede可以指“潮水退去”;Sink意为“下沉”。
转载请注明原文地址:https://www.tihaiku.com/zcyy/4033702.html
相关试题推荐
Thefloodsdidnotstartto_____untiltwodaysaftertherainhadstopped.A、reti
Floodscausebillionsofdollarsworthofpropertydamage______.A、relativelyB、a
Thefloodsdidnotstartto______untiltwodaysaftertherainhadstopped.(20
随机试题
[originaltext]W:Howareyoudoing,Christopher?M:Tobehonest,I’mreallyfe
[originaltext]W:Hey,youknow,Iamthinkingofpaintingourroom.Whatdoyou
针对下列被审计单位制定的内部控制中,注册会计师认可的有( )。A、只有附有装运凭
带电断、接(____)等设备引线时,应采取防止引流线摆动的措施。(A)空载线路
在估算房地产开发项目的房屋开发费用时,用单位工程量投资乘以工程量来估算单项工程投
保险的宏观作用是保险对全社会和整个国民经济总体所产生的经济效应,其作用主要为(
某大型设备采购,买卖双方在合同中约定交货时支付部分货款,产品质量委托第三方验收,
鼓励技术中最常用的方法是()。单选(A)不断提问 (B)给予奖励 (C)及
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
建设工程施工过程,可能会出现不利的地质条件(如地勘未探明的软弱层)而使施工进度延
最新回复
(
0
)