首页
登录
职称英语
Tacoma Narrows Bridge Disaster Strikes When the Tacoma Narrows
Tacoma Narrows Bridge Disaster Strikes When the Tacoma Narrows
游客
2025-02-17
29
管理
问题
Tacoma Narrows Bridge Disaster Strikes
When the Tacoma Narrows Bridge opened for traffic on 1 July 1940, it was celebrated as a major engineering achievement. Even before construction was completed, however, flaws in the design were apparent; workers sucked on lemon slices to avoid motion sickness as the structure swayed in the relatively mild winds. Engineers tried three different revisions during construction to address the vibration problem. Initially, fie-down cables were anchored to fifty-tone bulkheads on the river banks. These were ineffective, as the cables soon detached. Then a pair of inclined cable locks was introduced to connect the main cables to the bridge deck at mid-span. These stayed throughout the bridge’s lifespan, but did nothing to reduce vibration. A further measure—the installation of hydraulic dampers between the towers and the floor system—was nullified because the dampers were compromised when the bridge was sand-blasted before painting.
Shortly after opening, the bridge quickly acquired the fond nickname of "Galloping Gertie" because of the way it would roll in either side-to-side or length-ways movements—known in physics terms as the longitudinal and transverse modes of vibration respectively. These movements did not compromise the core integrity of the structure, but did make the crossing a somewhat white-knuckle affair. Many drivers reported seeing cars ahead disappear from sight several times as they sank into troughs from transverse vibrations (imagine the ripple across a packed stadium during a Mexican wave ). The experience of a longitudinal wave is closely analogous, but more accurately associated with the waves one would encounter in the ocean. On a suspension bridge though, these waves are a unique experience—some dare-devils were happy to pay the 75c toll just for the thrill!
Four months later, however, a never-before-seen type of vibration began afflicting the bridge in what were still fairly gentle winds (about 40 kemp). Rather than the simple "wave" motion that characterizes longitudinal and transverse vibration, the left side of the bridge would rise while the right side fell, but the centre line of the road would remain completely level. This was proved when two men walked along the centre of the bridge completely unaffected by the rocking motions around them. Visually the bridge’s movements seemed to be more like a butterfly flapping its wings than a simple rolling motion. Engineers now understand this to be the tensional mode of vibration, and it is extremely hard to detect. In aero plane design, for example, even minute shifts of the aircraft’s mass distribution and an alteration in one component can affect a component with which it has no logical connection. In its milder forms this can cause a light buzzing noise, similar to that which a wasp or a bumble bee makes, but when allowed to develop unchecked it can eventually cause the total destruction of an aero plane.
The tensional mode of vibration is the consequence of a set of actions known as aerostatic flutter. This involves several different elements of a structure oscillating from the effect of wind, with each cycle of fluttering building more energy into the bridge’s movements and neutralizing any structural damping effects. Because the wind pumps in more energy than the structure can dissipate, and the oscillations feed off each other to become progressively stronger, the aerostatic fluttering and tensional vibrations were all but assured to destroy the Tacoma Bridge on the morning of 7 November. At 11.00 a.m. the fluttering had increased to such amplitude that the suspender cables were placed under excessive strain. When these buckled, the weight of the deck transferred to the adjacent cables which in turn were unable to support the weight. These cables buckled, leaving nothing to stop the central deck breaking off into the Tacoma River.
It was at around 10.15 a.m. on 7 November that tensional vibration began afflicting the bridge. This made driving treacherous, and newspaper editor Leonard Coats worth’s car was jammed against the curb in the centre of the bridge as he attempted to cross. Coats worth tried to rescue his daughter’s cocker spaniel from the back seat but was unsuccessful, and fearing for his life, crawled and staggered to safety on his own. At this point, an engineering professor named Bert Farquharson proceeded onto the bridge in an attempt to save the frightened animal. Farquharson had been video-recording from the banks of the fiver and had just returned from purchasing more rolls of film. As an avowed dog lover he felt obliged to attempt a rescue. Unfortunately, the professor too was bitten and retreated empty handed, walking off just moments before the cables snapped and the giant concrete mass of the central deck caved inwards and disappeared into the fiver.
Questions 14-16
Complete the notes below.
Choose NO MORE THAN TWO WORDS from the passage for each answer.
Write your answers in boxes ]4-16 on your answer sheet.
Engineers used various techniques while building the bridge to reduce wobble:
they attached (14) to heavy blocks on the shoreline
they fastened main cables to the middle of the (15)
(16) were placed between the tallest parts of the structure and the deck. [br]
选项
答案
bridge deck
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3960972.html
相关试题推荐
TacomaNarrowsBridgeDisasterStrikesWhentheTacomaNarrows
TacomaNarrowsBridgeDisasterStrikesWhentheTacomaNarrows
TacomaNarrowsBridgeDisasterStrikesWhentheTacomaNarrows
随机试题
PASSAGETHREE[br]Whatdoestheauthormeanbysaying"Itsfuturecannowscarc
试述区域卫生规划的作用。
某校正装置的传递函数为,τ>0,T>0,则以下说法正确的是( )。A.该校正装
某市孙先生(现年65岁)的女儿小林(现年25岁,月收入8000元人民币)准备结婚
处方中缩写词po.代表的含义是A.注射剂 B.外用 C.每晨 D.安瓿剂
个人理财业务是经()批准的一项用户中间业务。A.中国人民银行 B.中国银监
在施测MMPI测验时,如被试者遇到不能回答的问题时,主试者可告之()。 A.可
盐酸普鲁卡因降解的主要途径是A.水解 B.氧化 C.光学异构化 D.脱羧
A.提高患者抗病能力,促使早日恢复健康 B.阻止毒物继续进入人体内,促使毒物排
根据FIDIC《土木工程施工合同条件》,关于履约担保的说法正确的有( )A.承
最新回复
(
0
)