首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What is the pur
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What is the pur
游客
2025-02-07
11
管理
问题
Art Murals
[br] What is the purpose of having an air space between the outer wall and the plaster?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、It will protect the plaster from temperature changes.
B、It will give the mural a greater sense of depth.
C、It will reduce the time needed for drying the plaster.
D、It will eliminate the need to wash the wall frequently.
答案
A
解析
The student says We could create an air space between the outer wall of the building and the plaster; The air space would have an insulating effect. What 1 mean is’, it would slow down any temperature changes on the plaster. (2.2)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3946735.html
相关试题推荐
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatisstatedinthelec
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Arethesestatementstrue
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Iseachofthesetrueabo
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoefspeakc_0087_20124[/img][originaltext]Whatisstr
随机试题
[originaltext]W:Nowweturntooneoftheintervieweestogiveusmoreinforma
[originaltext]M:Let’sgooutfordinnertonight.ShallwetrythatnewFrench
B
票据的出票日期为2008年3月12日,下列选项中将出票日期填写正确的是()。
患者男性,31岁。尿频、尿急、尿痛1年余,有时尿混浊,服用多种抗生素治疗无效,尿
患者,女,27岁。皮疹瘙痒,遇风加重,苔薄白。用药应首选的是()A.苦
混凝土异形柱框架结构,某中柱节点如题图所示,节点核心区采用普通混凝土,强度等级C
集体合同订立后,应当报送劳动行政部门,劳动行政部门自收到集体合同文本之日起15
涌水地段隧道施工,处理涌水的辅助施工办法是()。A.坡排水 B.超前钻孔
关于建筑安装工程费用项目按照费用构成要素划分,其组成部分有()。A.人工费
最新回复
(
0
)