首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What is the pur
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What is the pur
游客
2025-02-07
46
管理
问题
Art Murals
[br] What is the purpose of having an air space between the outer wall and the plaster?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、It will protect the plaster from temperature changes.
B、It will give the mural a greater sense of depth.
C、It will reduce the time needed for drying the plaster.
D、It will eliminate the need to wash the wall frequently.
答案
A
解析
The student says We could create an air space between the outer wall of the building and the plaster; The air space would have an insulating effect. What 1 mean is’, it would slow down any temperature changes on the plaster. (2.2)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3946735.html
相关试题推荐
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatisstatedinthelec
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Arethesestatementstrue
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Iseachofthesetrueabo
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoefspeakc_0087_20124[/img][originaltext]Whatisstr
随机试题
Ifthereisanysingle【21】thatmakesforsuccessinliving,itistheabilit
技术分析法是对市场以外影响市场价格的因素进行研究来预测市场价格变动方向的方法。()A、正确B、错误B技术分析法是通过对市场行为本身的分析来预测市场价
施工完成的雨污水管道在回填前应该按照设计及规范要求进行闭水试验,试验结果由()
引起中药散气变味的主要因素是A.温度 B.湿度 C.成分 D.空气 E.
网路图中的关键路线是指()。A:总时差和自由时差相等的线路 B:时标网路图上
下列各项中,纳税人不可以提出行政复议的是( )。A、税务机关作出的强制执行措施
书籍:装帧A.策划:设计 B.粉刷:油漆 C.服装:熨烫 D.理发:美容
城市规划中社会调查所用到的相关数据、资料的种类大体上包括()。A.基础数据
先由参保人自付一定比例后,再按基本医疗保险规定的分担办法支付的是A.《国家非处方
A.苦杏仁、苏子 B.百部、马兜铃 C.桑白皮、葶苈子 D.白果、枇杷叶
最新回复
(
0
)