首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why is the clas
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why is the clas
游客
2025-02-07
30
管理
问题
Art Murals
[br] Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3946731.html
相关试题推荐
[img]2012q2/ct_etoefm_etoeflistz_0635_20124[/img][br]Whatisoneadvantageof
[img]2012q2/ct_etoefm_etoeflistz_0635_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoeflistz_0635_20124[/img][br]Whatisthelecturemainl
[img]2012q2/ct_etoefm_etoeflistz_0628_20124[/img][br]Whatdoestheprofessori
[img]2012q2/ct_etoefm_etoeflistz_0628_20124[/img][br]Accordingtothelecture,
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Iseachofthesetrueabo
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatdoestheprofessori
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Howistheinformationin
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]WhatisNOTtrueaboutvi
随机试题
[originaltext]Goodmorning.I’mMarioRitter.TodayIamgoingtotalkabou
在实际工程中,为减少荷载作用在钢筋混凝土结构中引起的裂缝宽度,采取以下哪一种措施
当污泥的含水率从99.5%降低至96.0%时,求污水的体积是原体积的几分之几?(
女,26岁,因急性阑尾炎,拟在连续硬膜外麻醉下行阑尾切除术。该病人硬膜外腔穿刺应
患者,男,40岁。癫痫病史多年,今因癫痫持续状态被送入医院。应采取的治疗措施是A
对于软弱、破碎围岩中的隧洞开挖后喷混凝土的主要作用在于( )。 A、及时填补
下列投资控制采取的措施有误的一项是( )。A:组织措施 B:投资措施 C:
关于《四库全书》,下列说法错误的是( )。A.编修于乾隆时期 B.反映了
发行人首次公开发行股票申请文件受理后,发行人能够预先披露招股说明书的网点包括()
根据《中华人民共和国固体废物污染环境防治法》,对( )固体废物的设施、设备和场
最新回复
(
0
)