首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2025-01-26
44
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Given a suite of robust adaptive distributed algorithms for flood warning, it will benefit the developing countries.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3929720.html
相关试题推荐
Becauseitisnotaseriousproblem,wearenotnecessarytotakestrictmeasure
Nuclearpower,withallitsinherentproblems,isstilltheonlyoptiontoguara
Inspiteofaproblemwiththefaultyequipment,someveryusefulworkwasaccom
Yourkindnessingiving______totheconsiderationoftheaboveproblemwillbe
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
随机试题
HALLMARK:A、untypicalcharacteristicB、prematureoccasionC、unluckyeventD、serio
Severalrecentstudieshavefoundthatbeingrandomly(随机地)assignedtoaro
A.5 B.10 C.15 D.25
某立方体岩石试件,外形尺寸为50mm×50mm×50mm,测得其在绝干、自然状态
对于操作风险,商业银行可以采取的识别方法是()。A.标准法 B.基本指标法
在肘横纹中,肱二头肌腱桡侧凹陷处的腧穴是( )。A.列缺 B.孔最 C.太
项目建设的活动主体是()。A、施工单位及监理单位 B、项目法人 C、项目法人
A.POX B.PAS C.NAP D.ACP E.AS-DNAE诊断M
老杨工作退休后一直感到不习惯,社会活动减少,后来发展到经常为一些小事与妻子吵架,
(2020年真题)下列各项中,资产负债表中“期末余额”根据总账科目余额直接填列的
最新回复
(
0
)