首页
登录
职称英语
Going on computer may be the toughest job a remodeling contractor ever does.
Going on computer may be the toughest job a remodeling contractor ever does.
游客
2024-11-01
26
管理
问题
Going on computer may be the toughest job a remodeling contractor ever does. In order to make a conversion within a year, a company will need to make a major shakeup. This does not mean it will take a year to start using the computer for one function such as estimating, accounting, or word processing. The total conversion process will not be accomplished in a short period with little effort. A contractor in Indiana recently said he wished someone had warned him about how tough it was going to be. With an annual volume of more than $500,000 and a good staff in place he still had fear.
For effective use of the computer in a remodeling business, a complete change in methods of doing business usually is required. All management staff must get involved. Changes may include pre-selecting and standardizing products and systems, developing specifications, changing the estimating system, and requiring more detailed information on time card. The list goes on and On. Without the support and active leadership of top management, this process, in all likelihood, will be fought by employees and will fail.
It is true that a computer can save money by stepping up the speed of estimating and making job costing, bookkeeping, and accounting more efficient. Word processing will certainly reduce time in typing contracts, writing letters, and so on. Still, most companies do not save money using the computer. Once they have mastered the basic computer operation, they become so enthralled with its ability to do other things they never considered when it was purchased.
The computer business is changing so fast that a company on computer will want to spend money on the latest hardware, newest software, and so on. That is the bad news. The good news is that the computer simply revolutionizes the company’s ability to manage and innovate. The change in management methods, the ability to use numbers, and other new capabilities provide greater control over the company and allow it to grow and make more money. [br] According to the passage, a complete conversion can take______.
选项
A、several months
B、about a year
C、half a year
D、several years
答案
B
解析
通读文章第一段后可知,短时间内很难完成彻底改变。要想在一年之内完成革新,任何一家公司都必须作出大变动。因此几个月或半年相对较短,而几年相对过长,只有一年比较合适。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3826328.html
相关试题推荐
Goingoncomputermaybethetoughestjobaremodelingcontractoreverdoes
Theboyhadnointerestinanythingotherthancomputergames,whichwasgetting
TheCompetitionamongproducersofpersonalcomputersisessentiallyarace
TheCompetitionamongproducersofpersonalcomputersisessentiallyarace
Goingoncomputermaybethetoughestjobaremodelingcontractoreverdoes.
Goingoncomputermaybethetoughestjobaremodelingcontractoreverdoes.
Goingoncomputermaybethetoughestjobaremodelingcontractoreverdoes.
Acomputerisamachinedesignedtoperformworkmathematicallyandtostor
Whathappenedafterthemanbuilthisfirstcomputer?[br][originaltext]Maggie
Whathappenedafterthemanbuilthisfirstcomputer?[originaltext]Maggie:What
随机试题
(1)YuZhuopinghasn’ttakenavacationintwoyears,nordoesthe44-year-ol
下列关于现行《建筑抗震设计规范》(GB50011—2010)对高层钢结构房屋要
有关军团菌肺炎论述不正确的是A、可经过供水系统、空调等传播 B、治疗可以选择
被审计单位经营大型零售业务,所采购商品和固定资产的数量及支付的款项庞大,交易复杂
社会责任是公民、企业和各种组织对国家或社会公共利益方面应尽的责任或义务。社会责任
2013年该省的GDP同比增速为:() A.9.7% B.12.5%
在形象记忆中,一般人以()和()为主。
拿破仑执政时期所建立的帝国大学实质上是A.帝国的最高教育领导机构 B.由帝国建
某公司拟引进新设备改造现有生产线。项目运营期5年,建设投资在第1年年初投入,当年
采用《建设工程工程量清单计价规范》GB50500-2013的政府投资项目,在施
最新回复
(
0
)