首页
登录
职称英语
What happened to the London underground railway about three decades ago? [br] [
What happened to the London underground railway about three decades ago? [br] [
游客
2024-10-31
19
管理
问题
What happened to the London underground railway about three decades ago? [br]
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others.
The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different of the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. If one train stays too long at a station, the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、It will stop automatically.
B、It will move on at the same speed.
C、It will gradually slow down.
D、It will keep a safe distance from the other trains.
答案
A
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3825084.html
相关试题推荐
WhathappenedtotheLondonundergroundrailwayaboutthreedecadesago?[br][
WhathappenedtotheLondonundergroundrailwayaboutthreedecadesago?[br][
WhathappenedtotheLondonundergroundrailwayaboutthreedecadesago?[origin
Itwilltakeustwentyminutestogettotherailwaystation,_____trafficdela
JameswasborninLondon________May7,1952________4:45________themorning
Afewweeksago,Ihada【C1】______unusualflightfromLondontoKhartoum.
Afewweeksago,Ihada【C1】______unusualflightfromLondontoKhartoum.
Afewweeksago,Ihada【C1】______unusualflightfromLondontoKhartoum.
Afewweeksago,Ihada【C1】______unusualflightfromLondontoKhartoum.
Afewweeksago,Ihada【C1】______unusualflightfromLondontoKhartoum.
随机试题
ThecrucialyearsoftheDepression,astheyarebroughtintohistoricalfoc
WhenFuatEcerdecidedtogobacktoschoolforanM.B.A.afterthreeanda
ThePlayofPower:AnIntroductiontoAmericanGovernmentJ
U.S.ExpandsInvestigationintoPiracyofSoftwareI
IfoursolarsystemhasaHell,it’sVenus.Theairischokedwithfouland
从所给的四个选项中,选择最合适的一个填入问号处,使之呈现一定的规律性:
均质圆柱体重P,直径为D,置于两光滑的斜面上。设有图示方向力F作用,当圆柱不移动
简述结果加重犯的特征。
选择和确定项目管理模式,应考虑的主要因素有() A.建设项目的目标B.业主
施工单位申请工程延期时,项目监理机构对施工单位的申请事项进行审核并签署意见,由(
最新回复
(
0
)