首页
登录
职称英语
Today, most countries in the world have canals. Some canals, such as the Sue
Today, most countries in the world have canals. Some canals, such as the Sue
游客
2024-09-24
21
管理
问题
Today, most countries in the world have canals. Some canals, such as the Suez or the Panama,【C1】______ships weeks of time by making their voyage a thousand miles shorter. Other canals permit boats to reach cities that are not located on the coast.【C2】______other canals drain lands where there is too much water, help or【C3】______fields where there is not enough water.
The【C4】______of a canal depends on the kind of boats going through it. The canal must be wide enough to permit two of the【C5】______boats using it to【C6】______each other easily. It must be deep enough to leave about two feet of water【C7】______the keel of the largest boat using the canal. Some canals have sloping sides, while others have sides that are nearly【C8】______. Canals that are cut through rock can have nearly vertical sides. 【C9】______, canals with earth banks may【C10】______if the angle of their sides is too steep. Some canals are lined with brick, stone, or concrete to keep the water【C11】______soaking into the mud. This also permits ships to go at【C12】______speeds, since they cannot make the banks fall in by【C13】______up the water. In small canals with mud banks, ships and barges(大平底船)must【C14】______their speed.
When the canal goes【C15】______different levels of water, the ships must be【C16】______or lowered from one level to the other. This is generally done by【C17】______of locks. If a ship wants to go up to higher water, the lower end of the lock opens to let the boat in. Then this gate closes, and the water is let into the lock chamber from the upper level. This raised the level of the water in the lock【C18】______it is the same as the upper level of water. Now the upper gates can be opened to【C19】______the ship into the higher water. Sometimes a canal contains a series of locks when the【C20】______in levels is very great. [br] 【C17】
选项
A、ways
B、methods
C、means
D、approaches
答案
C
解析
by means of为固定搭配。意为“通过…,用…的方法”。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3771543.html
相关试题推荐
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
Today,mostcountriesintheworldhavecanals.Somecanals,suchastheSue
随机试题
She___________(取消了纽约之行)becauseshewasill.calledoff/cancelledhertripto
Directions:Forthispart,youareallowed30minutestowriteashortessayent
以下各项中,()不是整体变更控制的输入。A.己批准的纠正措施 B.己完成
排除井巷中的浮尘要有一定的风速,提高排尘风速,粒径稍大的尘粒也能悬浮被排走,同时
在颗粒污染物中,( )是悬浮于空中的小液态粒子。A.粉尘 B.烟尘 C.
西河柳与荆芥除发表外,还均能A.透疹 B.止痉 C.止咳 D.除湿 E.
2×19年8月30日,甲公司自公开市场购入乙上市公司100万股普通股股票,购买价
根据支付结算法律制度的规定,非企业类存款人开立单位银行结算账户,自正式开立之日起
在建设工程施工阶段,监理工程师对施工进度计划审核的内容主要包括()。A.施工顺序
根据《中华人民共和国土地管理法》,( )应根据土地利用总体规划划入基本农田保护
最新回复
(
0
)