首页
登录
职称英语
(1) Daniel Chivu, a fourth-year Carleton University student from Toronto, ha
(1) Daniel Chivu, a fourth-year Carleton University student from Toronto, ha
游客
2024-08-25
35
管理
问题
(1) Daniel Chivu, a fourth-year Carleton University student from Toronto, had his lease in hand. He’d paid the month’s rent. And he had a van load of belongings to unload at his new place in the Glebe.
(2) Ready to begin another school year, the last thing he needed or expected, when he and his dad rolled into Ottawa on Tuesday, was to discover that his accommodation — a townhouse at 95 Fourth Ave. owned by Takyan Consulting & Development — was still very much under construction.
(3) "I paid my rent, I signed the lease, and this is what I get. It’s frustrating," Chivu said as he surveyed the unpainted walls, lack of lighting and the absence of fixtures in what was supposed to be his $765-a-month basement room. Never mind the pile of lumber, the thick carpet of dust on the floor and the distinct lack of furnishings.
(4) The young man wasn’t alone in his frustration. At least a dozen out-of-town students, some accompanied by their parents, showed up at the twin townhouses on Fourth Avenue near Bank Street, on Tuesday afternoon expecting to move in. Instead, they were left standing on the sidewalk staring for a few hours, with the property manager nowhere in sight.
(5) It wasn’t until early evening that Takyan’s Rakan Abushaar showed up to explain the situation.
(6) It wasn’t much help. After leading the group into the townhouse — ceilings without light fixtures or smoke alarms, a kitchen without appliances, doors without locks, and rooms without furniture, or, in some cases, without doors, were the most obvious signs of the unfinished state — Abushaar blamed the contractors and subcontractors for not finishing the work on time.
(7) "Until last night, I was promised it would be 100 per cent complete by this afternoon," he told the group. "Unfortunately, it wasn’t done." He then assured everybody that everything would be finished and ready for them to move in by Thursday afternoon. Or maybe "Friday, at the maximum."
(8) In the meantime, Abushaar, the president and chief executive of Takyan, offered to arrange hotel rooms for everyone, or, if they preferred, they could make their own arrangements and he would refund them the cost. He also offered to pay for the storage of the students’ possessions, if needed.
(9) Takyan describes itself as "a dynamic team providing a full range of real estate services focused on maximizing the client’s return on investment." Its services include managing developments, providing full-scale construction, and full-service property management.
(10) Neither the students nor their parents were pleased with the service they’d received. But there was little they could do unless they wanted to move in as is. The parents didn’t like the idea of their children being in rooms without locks or, indeed, beds.
(11) "This is not good," said Azan Nafiz, who drove his daughter Maria to Ottawa from Toronto to begin her first year at Carleton. He and his wife had to return home for work. What was he supposed to do with Maria?
(12) "She doesn’t know anything about Ottawa or where to go. And on her first day of university she has to go through this."
(13) Niamh Hester, an exchange student from the University of Edinburgh, already had a hotel room, but it was an unsettling way to begin student life in Canada.
(14) "I’m pretty shocked. I saw the place last week, and I was assured it would be ready today."
(15) In fact, early Tuesday morning she was informed by email that she could pick up the keys and move in that afternoon.
(16) When she arrived she found her room lacked lights and a door on the wardrobe. There was a hole in the bathroom ceiling waiting for the extractor fan. The fridge and stove were in the middle of the room, still wrapped in plastic. The smoke alarm was uninstalled.
(17) Hester, like the others, was also upset that no one from Takyan contacted her before Tuesday to explain the situation or give any hint that the townhouse would not be available as promised.
(18) Yet most seemed to accept that there was little they could do beyond taking Abushaar up on his accommodation offer and keeping their fingers crossed that he’d have the townhouse ready by the end of the week.
(19) "If it’s only until the end of this week, we can live with that," said Chivu’s father, also named Dan. "So long as they keep their promises." [br] When Daniel and other students arrived at Fourth Avenue, what did they find?
选项
A、A newly built townhouse that was fully furnished.
B、A bank, a construction site, and a townhouse on the street.
C、The president of Takyan—Abushaar was there greeting them.
D、Their rented rooms were still under construction.
答案
D
解析
细节题。文章开始就点明学生陆续抵达所租的住处后发现房间还没有完工。其他三个选项各有部分信息在文中出现,但都是张冠李戴,表述不正确。故选D。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3734882.html
相关试题推荐
Iwasasecond-yearmedicalstudentattheuniversity,andwasonmysecond
(1)Iwasasecond-yearmedicalstudentattheuniversity,andwasonmysec
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
AnewstudyfromtheUniversityofNewSouthWaleshasdiscoveredthatdurin
WashingtonUniversityinSaintLouis,Missouri,isa【T1】________university.
随机试题
Themostdramaticchangesthattookplaceduringtheseventeenthcenturyin
InEnglandrecentlythreeforeigngentlemenapproachedabusstop.Theystud
Listeningtomusicwhileyoudrivecanimproveyourreactiontimeandabilit
MarkTwainwasbornduringtheperiodoftheIndustrialRevolution.[br]MarkTw
[originaltext]W:Ithinkifyouwanttogetsomeexcitementinyourlifeyouou
城市详细规划应当在城市总体规划或分区规划的基础上,对城市近期建设区域内各项建设做
爆炸性气体环境是指在一定条件下,可燃性气体或蒸气与空气形成的混合物被点燃并发生爆
跌落式熔断器更换时,先拉()相,后拉()相(如有风时先拉背风的边相,后拉迎风的边
契税的具体征税范围包括()。A.国有土地使用权出让 B.房屋买卖 C.房屋
下列工程测量内容中,作为鉴定工程质量和验证工程设计、施工是否合理的依据的是( )
最新回复
(
0
)