首页
登录
职称英语
Pyramid City is an even more ambitious project to solve Tokyo’s housing pro
Pyramid City is an even more ambitious project to solve Tokyo’s housing pro
游客
2024-08-17
51
管理
问题
Pyramid City is an even more ambitious project to solve Tokyo’s housing
problem. A 1 ,000-metre tall pyramid, 12 times higher than the Great
Pyramid of Giza in Egypt, would contain 55 smaller pyramids, each of them 【M1】______
would be the size of the Giza original. If it is built, the pyramid will
consist in a series of skyscrapers suspended from the inside of the structure, 【M2】______
the pyramid will be 80 storey high, with parkland in-between the skyscrap- 【M3】______
ere. Three quarters of a million of people will live there. The skyscrapers will 【M4】______
be linked by series of hollow tubes containing a high-speed transport system. 【M5】______
Parts of the construction, include more than 150 kilometers of tunnels, will be 【M6】______
built by spider robots, and power will be provided by waves and wind.
A major problem is that Japan is situating on the seismic "ring of fire"— 【M7】______
an area of volcanic activity where stretches around the Pacific Ocean. 【M8】______
Pyramid City will have to withstand earthquakes, tsunamis and underwater 【M9】______
volcanic eruptions.
The designers of Pyramid City are certain that it will be built and make 【M10】______
safe from earthquakes, but probably not for another 100 years. [br] 【M7】
选项
答案
situating改为situated
解析
(be situated坐落于…。)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3723878.html
相关试题推荐
PyramidCityisanevenmoreambitiousprojecttosolveTokyo’shousingpro
PyramidCityisanevenmoreambitiousprojecttosolveTokyo’shousingpro
PyramidCityisanevenmoreambitiousprojecttosolveTokyo’shousingpro
PyramidCityisanevenmoreambitiousprojecttosolveTokyo’shousingpro
PyramidCityisanevenmoreambitiousprojecttosolveTokyo’shousingpro
Thecrewworkedsohard,theyfinishedtheentireprojectthreedays______schedu
Whatistheprojectmainlyconcernedwith?[br][originaltext]ChinaCentralRad
Whatistheprojectmainlyconcernedwith?[br][originaltext]ChinaCentralRad
Whatistheprojectmainlyconcernedwith?[originaltext]ChinaCentralRadioand
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
随机试题
LackofVitaminAistheleadingcauseofblindnessamongchildrenindevelo
[originaltext]W:NowI’vegotyourbackground,let’stalkaboutthemanagement
当顶棚或墙面表面局部采用多孔或泡沫状塑料时,其厚度不应大于哪项,且面积不得超过该
A.血府逐瘀汤 B.补阳还五汤 C.牵正散 D.地黄饮子 E.镇肝熄风汤
红外热像检测设置仪器的色标温度量程,一般宜设置在环境温度加10K~30K左右的温
2,6,10,7,11,( ) A.13 B.75 C.13 D
2015年,我国规模以上电子信息产业企业个数6.08万家,其中电子信息制造企业1
在合同开始日,企业应当对合同进行评估,下列说法不正确的是( )。A.如果合同中不
依据《环境影响评价法》,设区的某市发改委组织编制工业发展规划。对报送审查的环评报
背景资料 A公司中标一城市主干道工程,道路路基为土质路基,其中有近50m的软土
最新回复
(
0
)