首页
登录
职称英语
Driverless trains are a type of train first developed in the 1960s. As the name
Driverless trains are a type of train first developed in the 1960s. As the name
游客
2024-08-14
26
管理
问题
Driverless trains are a type of train first developed in the 1960s. As
the name shows, these trains operate automatically, without a driver.
It is believed that any of the earliest driverless trains were first 【M1】______
used to transport passengers on the London Underground system 【M2】______
from 1967. However, these early trains weren’t true ’driverless’ 【M3】______
because they had no operators to open and close the doors. 【M4】______
Modern driverless train systems such as the Dubai Metro have
no operators on board. Instead, the system is run through large control 【M5】______
centre. This has hundreds of CCTV camera so that the trains can be 【M6】______
monitored at all times.
Using driverless trains can save a lot of money because large
numbers of train drivers are no longer need. As well as being cheaper to 【M7】______
run, these train systems are often much less punctual and efficient. 【M8】______
This encourages more commuters to stop use cars in order to get to 【M9】_____
work every morning.
If more cities had efficient driverless trains for transporting commuters,
there would be less traffic congestion and pollutions in the world. 【M10】______ [br] 【M7】
选项
答案
need--needed
解析
(此处应当将need改为needed表被动,意为“列车司机不再被需要”。)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3719851.html
相关试题推荐
Driverlesstrainsareatypeoftrainfirstdevelopedinthe1960s.Asthename
Driverlesstrainsareatypeoftrainfirstdevelopedinthe1960s.Asthename
Driverlesstrainsareatypeoftrainfirstdevelopedinthe1960s.Asthename
Driverlesstrainsareatypeoftrainfirstdevelopedinthe1960s.Asthename
Driverlesstrainsareatypeoftrainfirstdevelopedinthe1960s.Asthename
Femi,martinandJamescatchtrainstogotothesamedestination.Femicatches
Theyhavedevelopedcomputersthatcanunderstandthingspeoplesay,andcannow
Whatdoesthenewsreportaboutthenewlydevelopedbatteries?[originaltext]Thr
Howmanyround-triphigh-speedtrainsbetweenFutianStationandGuangzhouSouth
Howmanyround-triphigh-speedtrainsbetweenFutianStationandGuangzhouSouth
随机试题
TheSecondWorldWarinsomewaysgavebirthtolessnoveltyandgeniusthanthe
AccordingtoDr.Adams,whatdoesthetitleofhisbooksuggest?[br][original
DISARM:A、confrontB、commandC、putonguardD、amuseE、protectC
Inthepast,therailroadprovidedthefastestandmostefficientkindoftransp
面积单位间的进率 1.题目:三年级《面积单位间的进率》片段教学 2.内容:
下列哪项检测项目对肝性脑病的诊断有参考价值A.ALT B.GGT C.AST
在房地产市场周期的某个阶段,初期房屋空置率略高于正常水平,随后需求增加使空置率下
财贸金融楼,地上9层,层高4m,每层建筑面积1300㎡,下列关于该建筑内构件的做
关于预制安装水池现浇筑壁板接缝混凝土施工措施的说法,错误的是()。A、强度较预
最新回复
(
0
)