首页
登录
职称英语
SummaryListen to the passage. For questions 26—30, complete the notes using no
SummaryListen to the passage. For questions 26—30, complete the notes using no
游客
2024-08-14
31
管理
问题
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
The best-seller wooden toy among our products is【D6】______, which is designed for 【D7】______. Our output per month is 4,000 items, and the average【D8】______time per box is 5 minutes. We have 1000 boxes in storage, and the next dispatch will come on November third. Currently , we have 20 drivers and 40 staff working on the【D9】______. All staff do【D10】______ work. [br] 【D9】
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
Well, the next product I want to move onto is children’s toys. In this part of building, we manufacture several different wooden toys. But the greatest demand is for our train sets. These are made up of ten pieces and each piece is a different color. It’s a toy for the under-fives and it sells well. We manufacture 1,000 of these every week. That’s a total production of 4,000 a month. Over here, we put all the toys into boxes. Because this is a product for young children, everything has to be very carefully checked beforehand. So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country. Orders are not constant, but go up and down depending on what time of the year it is. So we try to keep about 1,000 boxes in storage at any one time. That’s the number that we have at the moment anyway. As I said, we deliver our children’s toys to stores around the country. Outside, we’re just loading up the lorries which are going to set off tomorrow. That’s November third. Then there won’t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines. As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’re working.
选项
答案
production lines
解析
(根据录音中的“we have 40 staff working on the production lines”可知,生产线上的员工一共有40名。故填production lines,表示“生产线”。)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3719491.html
相关试题推荐
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
随机试题
WithMeredith’sTheEgoistweenterintoacriticalproblemthat
PerchedamongthehighlandsofwesternCameroon,borderedbygreenmountains
高速公路、一级公路零填和挖方路段路床0.8-1.2m范围的膨胀土应进行换填处理,
下列属于预防电气线路接触电阻过大的措施是()。A.严禁滥用铜丝、铁丝代替熔
黄疸的病位主要在A.心、肾 B.肺、肾 C.心、小肠 D.表、里 E.脾
冷球蛋白出现沉淀时的温度是( )。A.4℃ B.30℃ C.37℃ D.
下列免责事项中,哪些属于因除外风险承运人可以免责( )。 A.航行过失造成
当主、次干路车流量在高峰时段特别集中,间隙特别小时,应考虑安装()自动控制信
在软土地层修建地铁车站,需要尽快恢复上部路面交通时,车站基坑施工方法宜选择( )
具有补偿能力大,流体阻力和変形应力小,且对固定支座的作用力小等特点,主要靠角位移
最新回复
(
0
)