首页
登录
职称英语
SummaryListen to the passage. For questions 26—30, complete the notes using no
SummaryListen to the passage. For questions 26—30, complete the notes using no
游客
2024-08-14
53
管理
问题
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
The best-seller wooden toy among our products is【D6】______, which is designed for 【D7】______. Our output per month is 4,000 items, and the average【D8】______time per box is 5 minutes. We have 1000 boxes in storage, and the next dispatch will come on November third. Currently , we have 20 drivers and 40 staff working on the【D9】______. All staff do【D10】______ work. [br] 【D9】
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
Well, the next product I want to move onto is children’s toys. In this part of building, we manufacture several different wooden toys. But the greatest demand is for our train sets. These are made up of ten pieces and each piece is a different color. It’s a toy for the under-fives and it sells well. We manufacture 1,000 of these every week. That’s a total production of 4,000 a month. Over here, we put all the toys into boxes. Because this is a product for young children, everything has to be very carefully checked beforehand. So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country. Orders are not constant, but go up and down depending on what time of the year it is. So we try to keep about 1,000 boxes in storage at any one time. That’s the number that we have at the moment anyway. As I said, we deliver our children’s toys to stores around the country. Outside, we’re just loading up the lorries which are going to set off tomorrow. That’s November third. Then there won’t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines. As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’re working.
选项
答案
production lines
解析
(根据录音中的“we have 40 staff working on the production lines”可知,生产线上的员工一共有40名。故填production lines,表示“生产线”。)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3719491.html
相关试题推荐
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
随机试题
Fathergave$20tometobuysomebooks.I______$20byfathertobuysomeboo
[originaltext]W:Hello,Mr.Cooper.I’mLinaRedner.salesrepresentativeforS
礼节性会见时间()。A.较短,通常在1小时左右 B.较长,通常在2小时左右
单摆由长l的摆杆与摆锤A组成,其运动规律φ=φ0sinωt。锤A在t=π/4w秒
6~7岁的儿童的力平均为A.25kg B.30kg C.15kg D.20
下列属于存货的是( )A.房地产开发企业购入的用于建造商品房的土地使用权 B
医疗机构的从业人员基本行为规范:①以人为本,践行宗旨;②遵纪守法,依法执业;③尊
招标人对已发出的招标文件进行修改的,应当在( )以书面形式通知所有招标文件收受人
高压钢管检验时,对于管子外径大于或等于35mm的管材,除需进行拉力和冲击试验
《中华人民共和国航道法》第二十一条规定船舶在航道水域中沉没,影响航道畅通和通航安
最新回复
(
0
)