首页
登录
职称英语
A very rapid increase in the number of ships between American and European po
A very rapid increase in the number of ships between American and European po
游客
2024-07-28
49
管理
问题
A very rapid increase in the number of ships between American and European ports began almost immediately after the end of the War of 1812 in order to meet the new need for the regular rapid transportation of mail, light cargo, and passengers. It was the increase in emigration to America that for the first time made the carrying of passengers across the Atlantic more profitable than the transportation of heavy cargo. A new type of sailing, the packet (邮船), appeared to meet this new demand, and the extent of the demand very soon resulted in strong competition among several packet lines. The earliest of these was the Black Ball Line established in New York in 1816, only a year after the end of the war. The scheduled service of this famous line started with four of the new fast packets each of 400 to 500 tons: the Pacific, the Amity, the James Cooper, and the William Thompson. During the first twenty years of service, the average time from New York to Liverpool was 23 days and the average trip back to New York took 40 days. By the middle of the century, packets had increased in size to between 900 and 1,000 tons and their speed had increased. The Red Jackel once sailed from New York to Liverpool in 13 days, 11.5 hours. The Mary Whiteridge took 4.5 hours off this record on a run from Baltimore to Liverpool. Such speeds were far greater than the average of from 19 to 21 days to Liverpool and from 30 to 35 homeward to New York, but the packets had still set a new standard for transoceanic travel. No wonder that steamships, the first of which tried to compete with the packets in 1838, only began to replace them in the 1850s.
选项
A、Liverpool to New York
B、New York to Liverpool
C、Baltimore to Liverpool
D、Liverpool to Baltimore
答案
C
解析
题目问作者提到的最快捷的跨越大西洋航线是哪条。文章后半部分提到在最初四条航线的激烈竞争中,The Red Jackel从纽约至利物浦只需13天零11个半小时,而 The Mary Whiteridge从巴尔的摩至利物浦所需的时间比这个时间还少4个小时,即 13天零7个小时,且这个速度远远超过了当时的平均速度。所以答案为C。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3696401.html
相关试题推荐
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
Thelinkbetweenhealthandincomeseemsprettyuncontroversial.【C1】______al
随机试题
【S1】[br]【S5】Much→Little本句正常语序为Muchevidenceofhealthrisksfromeatingthemh
PASSAGETHREE[br]Whatdoesthesentence"thegovernmenthascut...trainingcou
图示罗马时期完全以防御要求实施的理想城市是( )。
男性,45岁。上腹不适、腹胀1个月。CT扫描检查发现肝左叶10cm大小占位,提示
下列不是必需氨基酸的是A:亮氨酸 B:色氨酸 C:赖氨酸 D:缬氨酸 E
母线拆卸大修后,无需进行重新核相。
某省政府机关办公大楼建筑高度为31.8m,大楼地下一层设置发电机作为备用电源,市
赵某与王某发生借贷纠纷,赵某于2010年9月14日向法院起诉,并向法院提供证人甲
电焊和气焊均会产生紫外线而引起功能性伤害,在焊接作业现场,应设置指令标识和警告标
建设项目的环境经济损益分析中,费用效益分析应在财务现金流量表基础上增加( )。A
最新回复
(
0
)