首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-06-08
77
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London, The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so- called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
综合短文中的The world’s first completely automatic railway has been built under the busy streets of London.及and it is part of the complete London underground railway.…was opened in 1969可知,B为答案
转载请注明原文地址:https://www.tihaiku.com/zcyy/3625230.html
相关试题推荐
[originaltext]AmericanmagicianDavidBlaineistobesuspendedinaglass
[originaltext]Ifyou’vebeenoncampusforverylong,I’mcertainthatyou’
[originaltext]Ifyou’vebeenoncampusforverylong,I’mcertainthatyou’
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]Theworld’sfirstcompletelyautomaticrailwayhasbeenbuilt
[originaltext]M:MayIseeDeanWilliamsplease?W:DeanWilliamswon’tbeint
[originaltext]M:MayIseeDeanWilliamsplease?W:DeanWilliamswon’tbeint
[originaltext]W:Ihaveneverseensuchawonderfulmovie.Ihopeyouenjoyedi
[originaltext]W:Ihaveneverseensuchawonderfulmovie.Ihopeyouenjoyedi
[originaltext]W:Ihaveneverseensuchawonderfulmovie.Ihopeyouenjoyedi
随机试题
STEREOREVIEWSMALLWONDERMAKE
Completethenotesbelow.ChooseNOMORETHANTWOWORDSfromthepassage
Itwasnot______1957thathewentbacktoAmerica.A、sinceB、untilC、beforeD、aft
PeopleintheUnitedStateslovetheirdogsandtreatthemwell.Theyusema
患者男性,55岁,右侧腹股沟可复性肿物3年。今日咳嗽后肿物突出,不能回纳6小时,
患儿,女,4岁。有哮喘病史,此次喘促迁延不愈月余,动则喘甚,面色少华,形寒肢冷,
A.鼠疫 B.流行性感冒 C.艾滋病 D.麻风病 E.流行性腮腺炎属于乙
根据技术创新的对象来划分,可将技术创新划分为()。A.产品创新 B.工艺创新
在三阶段设计过程中,监理工程师对技术设计图纸的审核应侧重于()。 A.所采
某工程在保修期内,因工程质量问题导致外墙漏雨,发包人多次通知承包人进行维修,但承
最新回复
(
0
)