The Environmental Protection Agency has set limits for the radiation permitt
The Environmental Protection Agency has set limits for the radiation permitt
游客
2024-06-06
26
管理
问题
The Environmental Protection Agency has set limits for the radiation permitted to
leak from a proposed nuclear waste burial center in the state of Nevada. The action will
help decided whether the federal government can build the nuclear waste dump at 【S1】______
Yucca Mountain.
The dump would be used to bury about seventy-thousand tons of nuclear waste.
The waste includes use nuclear fuel from power 【S2】______
centers and waste flora the production of nuclear weapons. The waste is now stored at 【S3】______
power center around the country.
Yucca Mountain is owned by the federal government No one lives there. It is in a 【S4】______
extremely dry area more than one-hundred-forty-five kilometers northwest of Las Vegas.
The administration of President Bush behaves a nuclear
waste Dump should develop there. It says this dump is needed to 【S5】______
permit an decrease in nuclear power centers. Federal officials 【S6】______
supports more use of nuclear power because of the nation’s energy problems. But 【S7】______
Nevada state officials strongly approve the plan. The dispute about Yucca Mountain 【S8】______
has continued for almost twenty years.
The Environmental Protection Agency recently establish radiation limits for 【S9】______
groundwater, air and soil near Yucca Mountain. Both sides claimed that the agency
ruling helped their cause. Department of Energy Secretary Spencer Abraham says his
agency can meet the new requirement. Mister Abraham says the government may 【S10】______
continue with the project by the end of the year. [br] 【S10】
选项
答案
requirement改为requirements
解析
因为要求肯定不止—个,因此应该用复数形式。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3621651.html
相关试题推荐
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermitt
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermitt
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermitt
TheEnvironmentalProtectionAgencyhassetlimitsfortheradiationpermitt
[originaltext]M:Ijustcalledthetravelagency,it’sallset.OnJunefirst,
[originaltext]M:Ijustcalledthetravelagency,it’sallset.OnJunefirst,
[originaltext]M:Ijustcalledthetravelagency,it’sallset.OnJunefirst,
[originaltext]M:Ijustcalledthetravelagency,it’sallset.OnJunefirst,
[originaltext]M:Ijustcalledthetravelagency,it’sallset.OnJunefirst,
Airpollutionisoneofthemostpervasiveenvironmentalproblemsbecauseat
随机试题
Thewordconservationhasathriftymeaning.Toconserveistosaveandprotec
__________(就我们医生而言),thisarrangementisquitegood.Buthowaboutthepatients?
协调功能障碍又称为:A.平衡障碍 B.小脑共济失调 C.基底节共济失调 D
以下不属于证券投资基金会计核算内容的业务是( )。A.估值核算 B.基金公司
下列哪个不是M胆碱受体阻断剂中的莨菪生物碱A.山莨菪碱B.东莨菪碱C.阿托品D.
“在选址意见书、建设用地规划许可证、建设工程规划许可证或者乡村建设规划许可证发放
假设其他因素不变,下列各项中会引起欧式看跌期权价值增加的有()。A.到期期
(2018年真题)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2
给水与污水处理厂试运转单机试车,一般空车试运行不少于()h。A、1 B、2
海底管道防腐蚀常采用牺牲阳极阴极保护系统,其牺牲阳极常采用()。A.铝合金阳极
最新回复
(
0
)