首页
登录
职称英语
[originaltext] (32)The world’s first completely automatic railway has been b
[originaltext] (32)The world’s first completely automatic railway has been b
游客
2024-05-15
33
管理
问题
(32)The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. (33)Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. (34)If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots." The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. (35)Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
32. What happened to the London underground railway over four decades ago?
33. Who checks and collects the tickets on the Victoria Line?
34. What is the task of the one worker on the Victoria Line train?
35. What will happen on the line if each train moves at its own speed?
选项
A、There will be danger of accidents on the line.
B、The train will run off the rails.
C、Their speeds will be automatically fixed by the computers.
D、The train will keep a safe distance from each other.
答案
A
解析
推理判断题。短文指出会有机器设定火车的速度,使其保持安全距离,这样就不会有碰撞的危险。由此可知,如果每列火车都按自己的速度任意行驶,不互相照应,就会有发生事故的危险。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3598905.html
相关试题推荐
[originaltext]Theyearis2094.Ithasbeenannouncedthatacometisheadingt
[originaltext]Theyearis2094.Ithasbeenannouncedthatacometisheadingt
[originaltext]Facialexpressionscarrymeaningthatisdeterminedbysituat
[originaltext]W:DoestheMotorVoterLawcoverallthestates?M:No.W:Which
[originaltext]W:DoestheMotorVoterLawcoverallthestates?M:No.W:Which
[originaltext]W:DoestheMotorVoterLawcoverallthestates?M:No.W:Which
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]EllenTaaffeZwilichisoneoftheclassicalmusiccomposers
随机试题
Accordingtogovernmentstatistics,menofallsocialclassesinBritainvi
Youshouldspendabout20minutesonQuestions15-27,whicharebasedonReading
Youngpeoplearefacinganuncertainfuture.Asthe21stcenturydawned,the
以下关于空值(NULL)的叙述正确的是A.空值等同于数值0 B.VisualF
海洋权益是国家领土向海洋延伸形成的权益。下图为我国海洋权益范围划分示意图,
人在每一瞬间,将心理活动选择了某些对象而忽略了另一些对象。这一特点指的是注意的(
某企业通过相关软件记录登录网络浏览者浏览企业网页时所点击的内容.该企业采用 的
电动调节阀的电动执行机构和碟阀配合工作的要求,输出方式是( )。A.直行程 B
某省志愿者组织为艾滋病孤儿建立爱心学校,提供教育和生活资助,体现了我国艾滋病控制
Kernig征与Lasegue征(直腿高举试验)检查时有什么不同?
最新回复
(
0
)