首页
登录
职称英语
Today, most countries in the world have canals. Some canals, such as the Sue
Today, most countries in the world have canals. Some canals, such as the Sue
游客
2024-05-14
43
管理
问题
Today, most countries in the world have canals. Some canals, such as the Suez or the Panama,【C1】______ ships weeks of time by making their voyage a thousand miles shorter. Other canals permit boats to reach cities that are not located on the coast.【C2】______ other canals drain lands where there is too much water, help or【C3】______ fields where there is not enough water.
The【C4】______ of a canal depends on the kind of boats going through it. The canal must be wide enough to permit two of the【C5】______ boats using it to【C6】______ each other easily. It must be deep enough to leave about two feet of water【C7】______ the keel of the largest boat using the canal.
Some canals have sloping sides, while others have sides that are nearly【C8】______ Canals that are cut through rock can have nearly Vertical sides.【C9】______ , canals with earth banks may【C10】______ if the angle of their sides is too steep. Some canals are lined with brick, stone, or concrete to keep the water【C11】______ soaking into the mud. This also permits ships to go at【C12】______ speeds, since they cannot make the banks fall in by【C13】______ up the water. In small canals with mud banks, ships and barges (大平底船) must【C14】______ their speed.
When the canal goes【C15】______ different levels of water, the ships must be【C16】______ or lowered from one level to the other. This is generally done by【C17】______ of locks. If a ship wants to go Up to higher water, the lower end of the lock opens to let the boat in. Then this gate closes, and the water is let into the lock chamber from the upper level. This raised the level of the water in the lock 【C18】______ it is the same as the upper level of water. Now the upper gates can be opened to【C19】______ the ship into the higher water. Sometimes a canal contains a series of locks when the【C20】______ in levels is very great. [br] 【C18】
选项
A、after
B、until
C、by
D、during
答案
B
解析
根据句意:水闸里的水位应一直保持上升直到和运河里的水位一致,这样船只才能通过,故选 B。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3598699.html
相关试题推荐
[originaltext]Differentcountriesanddifferentraceshavedifferentmanner
[originaltext]Differentcountriesanddifferentraceshavedifferentmanner
Singaporeisoneoftheworld’ssmallestcountriesbutitisalsooneofth
Singaporeisoneoftheworld’ssmallestcountriesbutitisalsooneofth
Singaporeisoneoftheworld’ssmallestcountriesbutitisalsooneofth
Singaporeisoneoftheworld’ssmallestcountriesbutitisalsooneofth
Singaporeisoneoftheworld’ssmallestcountriesbutitisalsooneofth
Singaporeisoneoftheworld’ssmallestcountriesbutitisalsooneofth
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
Today,mostcountriesintheworldhavecanals.Manycountrieshavebuiltca
随机试题
说明:请以伍德高科技公司(WoodHi-techCompany)员工Peter的名义给新华科技市场经理写一封订货信。时间:3月17日。内容:1.
Dickhasneverbeenontime,______?A、hasDickB、hasn’tDickC、hasheD、hasn’th
关于入库审核,下列说法不正确的是( )。A.内容在标引加工完成后,即可提交审核
建设单位在选择监理单位时,应遵循的一个重要原则是()。 A、基于能力的选择
臧先生,头部被木棍击伤,伤后昏迷10余分钟,清醒后头痛、呕吐,3小时后又陷入昏迷
由于房地产开发项目可以通过预售和预租在开发过程中获得收入,而这部分收入又可以用作
下列属于指数化型证券组合特点的是()。 A.试图在基本收入与资本增长之间达到
新中国成立初期,起到临时宪法作用的文件是( )。A、《中华苏维埃共和国宪法大纲》
已知网络计划如下图所示,箭线上方括号外为工作名称,括号内为优先压缩顺序;箭线下方
当企业所有者权益增加,必然表现为企业资产的增加。()
最新回复
(
0
)