首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-05-14
66
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-nine years ago?
转载请注明原文地址:https://www.tihaiku.com/zcyy/3598010.html
相关试题推荐
[originaltext]Oneofthemaincomplaintsofcityresidents,notsurprisingl
[originaltext]Youshouldnotfearspidersbecauseoftheirpoison.Ofallt
[originaltext]W:Today’sgueston"ScienceUpdate"isDavidBrown.Dr.Brown,
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
随机试题
Directions:Forthispartyouareallowed30minutestowriteacompositiononth
网络计划中的关键工作是( )。A.自由时差总和最大线路上的工作 B.施工
2019年7月上旬,价格环比涨幅超过1%的生产资料有:A.6种 B.7种
普通硅酸盐水泥的代号是()。A、P·P B、P·F C、P·C D、P·O
既能祛风湿,又能退虚热的药物是A.胡黄连 B.黄柏 C.秦艽 D.地骨皮
延缓释药的药剂学方法是A.制成包表颗粒剂 B.制成油溶液 C.制成油混悬液
患者,女,GP,孕37周。阴道出血3天,无腹痛,出血量似月经量。为明确出血原因,
桩基规范法实际上是一种(),它不考虑桩基侧面应力扩散作用,将承台视作直接作用在
容易导致出血性膀胱炎的药物是A.奥沙利铂 B.异环磷酰胺 C.伊立替康 D
具有2路架空进线、全线有避雷线且进线长度为2km的1lOkV变电所,敞开式高压
最新回复
(
0
)