首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-05-13
48
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains.
This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; and it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、The workers on the underground platforms were replaced by machines.
B、It became the first completely automatic railway in the world.
C、A completely automatic line was added to its network.
D、Computers began controlling the trains on the line.
答案
C
解析
What happened to the London underground railway?
转载请注明原文地址:https://www.tihaiku.com/zcyy/3597114.html
相关试题推荐
[originaltext]Ofthethousandsofdifferentkindsofanimalsthatexistin
[originaltext]Ofthethousandsofdifferentkindsofanimalsthatexistin
[originaltext]W:Well,weheardsomepeoplejustnowwhoseemtofeelthatothe
[originaltext]W:Well,weheardsomepeoplejustnowwhoseemtofeelthatothe
[originaltext]M:Willthatbecashorcharge?W:IwanttopaybycheckifIma
[originaltext]M:Willthatbecashorcharge?W:IwanttopaybycheckifIma
[originaltext]M:Willthatbecashorcharge?W:IwanttopaybycheckifIma
[originaltext]Americansaresufferingfromaserioussleepdeficitwhileal
[originaltext]Americansaresufferingfromaserioussleepdeficitwhileal
[originaltext]W:Icometoremindyouofameetingscheduledfor10o’clockthi
随机试题
Onlyresidentshereenjoythe______ofusingthisparkinglot.A、privilegeB、possi
DinosaursandParentalCareP1:"Parentalcare"referstothelevelofinvestmen
泥浆护壁钻孔灌柱桩施工工艺流程中,“第二次清孔”的下一道工序是()。A.下钢筋
防治地脚螺栓与轴线相对位移过大的方法错误的是( )。 A、埋置螺栓时,采用型
在继电保护装置、安全自动装置及自动化监控系统屏(柜)上或附近进行打眼等振动较大的
2019年6月下旬,电解铜的价格约是无缝钢管的:A.9.5倍 B.9.8倍
()不是传统封闭式基金的交易便利性与开放式基金可赎回性相结合的一种新型基金。A:
()是指由基金管理人通过长期跟踪、研究基金经理投资经历,挑选长期贯彻自身投资理
薄荷的有效成分是
水泥混凝土拌和站原材料仓的容量应满足()。A.24h连续施工的需要 B.周最大
最新回复
(
0
)