首页
登录
职称英语
No one quite knows how many tunnels have been dug under London. Some of the
No one quite knows how many tunnels have been dug under London. Some of the
游客
2024-03-07
37
管理
问题
No one quite knows how many tunnels have been dug under London. Some of the city’s many underground channels have been subject to the Official Secrets Act. Others are so old they have fallen into disuse and been forgotten. Nonetheless, anyone walking through central London can reckon that the busy streets around them are mirrored in criss-crossing (十字交叉) tunnels below. The world’s first subterranean (地下的) railway, the London Underground, opened in the city 150 years ago. Last month the first tunnel for Crossrail, an ambitious 15 billion ($24 billion) new railway project running across London, was completed. It lies 40 meters below the surface of the city, a wonder of engineering. Why does London do so much tunneling?
London has evolved tightly packed, with narrow streets and alleyways spreading out across it like arteries. Between 1801 and 1851 its population grew from around 960,000 to over 2.5 million. Railway lines terminated at the edges of the city, as it was then defined, at Paddington and Victoria. As visitors and workers flocked to the city, its central roads became increasingly congested. Underground railways were built in 1863 to relieve the choked streets. Not everyone liked the early metro system, particularly as the trains still ran on sooty (煤烟熏黑的) steam engines. "I had my first experience of Hades today," spluttered R.D. Blumenfeld, an American journalist, in 1887, "
and if the real thing is to be like that I shall never do anything wrong.
" As the wealthiest city in the world at the time, London’s private investors could afford to sink money into the tunneling schemes.
London’s congestion created the need for tunnels and its booming economy provided the financing. But what made them feasible was the city’s location. The clay on which most of the city is built provided an excellent tunneling medium. It is soft enough to be excavated easily, but impermeable (防渗透的) enough to stay dry. Once it is dug through it will not crumble. It has a "stand-up time", says Roger Bridge of the British Tunneling Society—when the first Crossrail tunnel was being built, parts of the section could be bored out and then explored as the clay stayed in place. Harder rock would require more powerful machines or explosives to dig through it. In contrast, cities such as Dublin are built on a mixture of sandstone and boulder clay. The boulders make it difficult to mine through, while the sand absorbs water, making it less sturdy. Before the development of better technology, such as pressure-balance machines, such conditions made tunneling tricky. Indeed, parts of south London have fewer tunnels than the centre because fewer of its neighborhoods are built on clay. [br] Why does south London have fewer tunnels than other parts of London?
选项
A、Because there are fewer neighborhoods built on clay.
B、Because the clay of south London is difficult to build tunnels.
C、Because people living there do not like taking underground.
D、Because people living there cannot afford to build many tunnels.
答案
A
解析
推断题。根据题干中的south London have fewer tunnels可定位于本文最后一句,该句提到伦敦南部地区的隧道比市中的少,是因为南部地区建在泥土之上的地段更少。故选A。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3512949.html
相关试题推荐
NoonequiteknowshowmanytunnelshavebeendugunderLondon.Someofthe
NoonequiteknowshowmanytunnelshavebeendugunderLondon.Someofthe
NoonequiteknowshowmanytunnelshavebeendugunderLondon.Someofthe
NoonequiteknowshowmanytunnelshavebeendugunderLondon.Someofthe
NoonequiteknowshowmanytunnelshavebeendugunderLondon.Someofthe
Whatarethemainfeaturesofthecubistpaintings?[br]Thefactthattunnelsf
随机试题
[img]2012q1/ct_eirm_eirread_0037_20121[/img][br]side-effects
(1)Theuseofnitrousoxide,orlaughinggasduringchildbirthfelloutoff
OnSaturday,BexarCountyDigitalLibrary—a$2.4million,4,000-square-foot
一个消费者月汽油消费为1000元,假设现在汽油价格上涨了一倍,但其他商品价格没
患者男性,46岁。在连续硬膜外阻滞下行胆囊切除术,麻醉效果好,ECG示心率70次
利用影像资料更新1∶10000地形图数据时,影像的地面分辨率不得低于( )。A
患儿,男,4岁。患有特发性血小板减少性紫癜,近期出现不爱活动、毛发干枯、发育迟缓
小区外一圈小路正好围成了一个长为320米、宽为240米的长方形。小陈从长方形的宽
质量检验的主要形式包括()。 A.查验原始质量凭证B.质量管理体系认证
土鳖虫的别名有A.?虫 B.地鳖 C.地鳖虫 D.金边地鳖 E.东方地鳖
最新回复
(
0
)