首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-06
36
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 7, Para. 3)means_____.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
词汇题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3428118.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
[img]ct_epem_epelisv_01391(20097)[/img][originaltext]W:Weoftengofishingon
伦敦金属交易所的价格是国际有色金属市场的晴雨表。()A、正确B、错误A伦敦金属交易所自创建以来一直交易活跃,至今其价格依然是国际有色金属市场的晴雨表
[originaltext][12]Inthepastindustrieshadmorefreedomthantheyhaven
Paperisdifferentfromotherwasteproducebecauseitcomesfromasustaina
地震区砌体结构房屋之间的防震缝宽度,按下列何项取值?( )A.取钢筋混凝土框架
为判断胎儿成熟度,应测孕妇A.血中AFP B.尿中雌三醇 C.尿中雌二醇
关于无菌台的准备,下列哪项是错误的A.巡回护士用手打开手术包第一层 B.巡回护
病人证见神疲乏力,形寒肢冷,小使短少JS重脚肿,舌质淡胖,苔薄白,脉沉迟而细。治
当建设项目为一个单项工程时,其设计概算应采用的编制形式是( )。A.单位工程概
依据《建设项目安全设施“三同时”监督管理办法》,对于()进行可行性研究时,生产
最新回复
(
0
)