首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-01-22
31
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 7, Para. 3)means_____.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
词汇题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3384952.html
相关试题推荐
[originaltext](5)(6)SouthKoreahasshutdowntwonuclearreactorsafter
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
A、Makingfiberssoft.B、Reducinglaborcosts.C、Reducingwaste.D、Increasingeff
A、Tolowerthecostsofhaulingfoodwaste.B、Tosavemorefoodfortheworld.C
Carbohydratesarethemostabundantand______foodsourcesofenergy.A、lesscos
Whetherornotsolarenergycansaveyourmoneydependsonmanythings.Whereyo
Burninggarbagemightbeonekindofenergysourcethatwecanusetohelpmeet
Alltheusefulenergyatthesurfaceoftheearthcomesfromtheactivityof
Alltheusefulenergyatthesurfaceoftheearthcomesfromtheactivityof
Alltheusefulenergyatthesurfaceoftheearthcomesfromtheactivityof
随机试题
NoticeTURIN,June14th(AP)--Italy
TheXinjiangAirlinesservepassengersandcustomersinthesoutheastofChinao
Noinvestmentoffersabetterreturnthangivingthechildrenthebeststart
社会公益活动属于课外活动的哪种组织形式?()A.群众性活动 B.小组活动
石先生今年48岁,每月税后工资为4500元,他妻子高女士43岁,每月税后工资为3
承租的国有建设用地使用权可以()。A:转租 B:转让 C:出让 D:划拨
充气设备现场安装应先进行(____)处理,再注入绝缘气体。SF6气体注入设备后应
关于行政区域建置和变更权限,下列说法中正确的是:()A.全国人大批准省、自治区
下列资产减值准备相关科目的余额中,不在资产负债表单独列示的有( )。A.固定资产
已知某企业的税前利润为500万元,所得税为50万元,平均净资产为1000万元,则
最新回复
(
0
)