首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why does the in
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why does the in
游客
2024-01-04
26
管理
问题
Art Murals
[br] Why does the instructor say this:
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、To explain how a wall can be made stronger
B、To describe the process of framing a mural
C、To explain how to create an insulating air space
D、To describe a technique for texturing a plaster wall
答案
C
解析
Why does the instructor say this:
"Now, to do this—it’s called "furring" the wail—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this."
The instructor’s purpose is to explain how to create an insulating air space between the outer and inner walls. The instructor describes how to build another wall on top (?[strips of wood attached to the inside surface of the wall. The mural will be painted on this new wall. (2.3)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3332176.html
相关试题推荐
[img]2012q1/ct_eilm_eillist_0339_20121[/img][br][originaltext]DAWN:We’vecha
[img]2012q1/ct_eilm_eillist_0339_20121[/img][br][originaltext]DAWN:We’vecha
[img]2012q1/ct_eilm_eillist_0128_20121[/img][br][originaltext]Goodmornin
[img]2012q1/ct_eilm_eillist_0239_20121[/img][br]peertutor
[img]2012q1/ct_eilm_eillist_0239_20121[/img][br]familyfriends
[img]2012q1/ct_eilm_eillist_0302_20121[/img][br][originaltext]Agoodway
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
随机试题
TheUnitedStates【C1】______alargepartoftheNorthAmericancontinent.Its
Thegovernmentshouldtakethe(initial)______toendthestrikeinitiative此处空格为固
放射性核素骨显影,对于原发性骨恶性肿瘤阳性率是A.30% B.40% C
私募基金管理人、私募基金托管人、私募基金销售机构及其他私募服务机构及其从业人员从
护患关系发展到工作期的主要任务是A.与病人建立互相信任的关系 B.为病人日后的
下列哪项不是城市经济学中衡量城市规模的常用指标?( )A.人口规模 B.用地
判断病理性抑郁与非病理性抑郁的标准包括()。A.症状标准 B.严重程度标准
购置新建房的城镇土地使用税纳税义务发生时间为()。A.自房屋交付使用之次月
客车大循环运行方式要受到( )的限制,只能适用于各条线路所开班车都是同级客车的条
工程项目施工安全计划的内容主要有()。A.明确施工技术方案 B.确定安全
最新回复
(
0
)