首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] The instructor
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] The instructor
游客
2024-01-04
23
管理
问题
Art Murals
[br] The instructor briefly explains how moisture damages a mural. Indicate whether each sentence below is a part of the process. For each sentence, click in the correct box.
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
答案
Yes: Moisture seeps through the wall and dissolves salts in the wall material: When water leaks through a wall, it may dissolve the salts that are in the building materials.
No: The plaster dries more quickly than the paint: Not mentioned in the discussion.
No: An air space between the interior and exterior walls insulates the mural: ...an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture
Yes: Dried salt deposits form a white film on the mural: When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. (2.6)
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3332174.html
相关试题推荐
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentoalectureintheliteratureclass.[img]2011q1/ct_etoefm_
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
NarratorListentothelectureinbusinessclass[img]2011q1/ct_etoefm_etoef
[img]2011q1/ct_etoefm_etoefspeaka_0336_20111[/img]Q:Describeasituationinwhi
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Bas
BiologyCardiacMuscle[img]2012q1/ct_etoefm_etoeflistz_0107_20121[/img][br]Why
随机试题
Thelong,wetsummerhereinthenortheasternU.S.notwithstanding,there’s
Hestatedhisbelief____________________(认为进化是自然选择的产物).thatevolutionoccurre
Iftherangeofthesixmeasurements140,125,180,110,165,andxis80,which
[originaltext]M:Hi,I’vebeenlookingforyousincethemorning.Wherehaveyo
中国共产党党员的基本条件是()A.中国工人阶级的有共产主义觉悟的先锋战士 B
关于Ⅱ度Ⅰ型房室传导阻滞,哪项不符合A.可用阿托品、异丙肾上腺素治疗 B.P-
对开办药品经营企业所应具备条件的错误表述是A.具有依法经过资格认定的药学技术人员
六、问答题:(每题5分,共10分) 1、倒闸操作对解锁管理有哪些规定?
在一个研讨班上,学员对假劣药情形、适用法律和法律责任展开了讨论。讨论的情形主要包
招标人要求总承包人对专业工程进行统一管理和协调的,总承包人可计取总承包服务费,其
最新回复
(
0
)