首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
58
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Lack of trained personnel to maintain the system and an illiterate populace to warn won’t make trouble to their plan.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“This poses a number of challenges…”判断,本题表述错误。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3315161.html
相关试题推荐
Lackofmoneycontinuedtobea_________problem,andshefinancedthehomebyse
Tomcreditshisfatherforhis_________withtheresearchofsocialproblems.A、oc
Theproblemsthemselvesarestillnottrulystrategicbecausetheoperationoft
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
()清除()双击[br]()退出()操作系统L、F
Theso-calledAmericanizationphenomenonseemstobeaconsequenceofthere
下列关于卫生行政复议与卫生行政诉讼的说法中正确的有()A.性质不同,卫生行
下列关于科学与技术的关系描述正确的是( )。A.科学就是技术 B.科学解决理
最可能引起病理缩复环的是A.羊水过多 B.双胎妊娠 C.巨大儿 D.先兆子
2009年1-4月我国完成城镇固定资产投资为37082.30亿元,比去年同期增
单纯母乳喂养婴儿大便为2~4次/天,大便次数减少的时间是A.辅食添加后 B.出
甲公司对应收账款按照余额百分比法计提坏账准备,计提比例为8%。2015年年初,坏
某施工企业拟对外投资,但希望从现在开始的5年内每年年末等额回收本金和利息200万
下列哪种说法不正确A.苯妥英钠能诱导它本身的代谢 B.琥胺对小发作的疗效优于丙
最新回复
(
0
)