首页
登录
职称英语
The Greeks have a second Battle of Marathon on their hands. Their adversaries
The Greeks have a second Battle of Marathon on their hands. Their adversaries
游客
2023-12-17
57
管理
问题
The Greeks have a second Battle of Marathon on their hands. Their adversaries this time are not invading Persians, as in 490 B. C. , but environmentalists and archaeologists in growing numbers. They are closing ranks in opposition to plans to build a water sports complex at the historic battleground for use during the 2004 Olympics in Athens.
Opposition to the construction has been gaining strength in Greece and the rest of Europe since the plans were announced more than a year ago. After standing back from the controversy at first, American archaeologists are now speaking out against the project as a threat to the site of one of the most decisive battles in antiquity.
In the current issue of Archaeology, a magazine of the Archaeological Institute of America, Dr. Nancy C. Wilkie, the organization’s president, called on colleagues "to join in the effort to preserve this important historic and natural site."
Dr. Wilkie said the battlefield needed to he preserved because even after all this time, the plain, where the outnumbered Athenian army defeated the Persians, and the adjacent wetlands, where many Persian soldiers perished, "have yet to be fully investigated by archaeologists."
Environmentalists challenged the decision to create two artificial lakes for the rowing and canoe and kayak competitions, a grandstand and other buildings in the area of the coastal wetlands. They said the construction would not only intrude on the battle site but would endanger the wetlands, which are a haven for 176 species of birds and many rare plants and a vital stopover for migratory birds, including the rare glossy ibis. A number of appeals seeking to stop the construction are before an administrative court.
Defending the construction, Greek Olympic organizers insisted that Marathon was hardly a pristine landscape. Summer tourists flock to the Skinias beach, where the Persians are thought to have landed, and parts of the plain are already altered with farms and villages. The organizers noted that one of the lakes would replace an old airstrip. Their plans also include protection for the wetlands as a national park.
"It is impossible to create something like Waterloo or Gettysburg in this area," George Kazantzopoulos, environmental program manager for the Olympic organizers, has said. "It is already ruined."
But Dr. Dorothy King emphasized the intangibles of the issue. "The importance of the site is as much in its symbolism-it would be the equivalent of putting a theme park in the middle of the site of the Battle of Gettysburg."
Promoters of the construction have argued that the actual battlefield would not be affected because parts of what is now considered the site, including the Schinias beach, were three to six feet beneath the sea in antiquity.
But Dr. Wilkie, in her editorial, noted that a geological study conducted under the auspices of the American School of Classical Studies in Athens contradicted such claims. By drilling bore holes to a depth of 26 feet across the plain, geologists determined that the topography was little changed since the battle. The site for the proposed water sports center, the research showed, was not beneath the sea 2,500 years ago.
But international pleas and recent protests at Marathon have so far left the Olympic organizers unmoved. While work on the $ 44 million project continues, they have defended the construction as possibly the best thing that could happen to Marathon. It is, they said, a way to rescue the site from earlier unplanned and often shabby development.
Environmentalists and archaeologists, fearing that the project would instead attract more commercial development, said they were not ready to give up the fight and, like the defeated Persians, flee to their ships. [br] The promoters of the construction have argued that ______.
选项
A、the sports complex would be too small to alter the historic site
B、some areas of the battlefield are now beneath the sea
C、the site is already ruined and the construction will rescue it
D、the project would boom the sluggish economy
答案
C
解析
转载请注明原文地址:https://www.tihaiku.com/zcyy/3281040.html
相关试题推荐
TheUnitedStateshasamajorracialproblemonitshands.True,Britainisf
TheUnitedStateshasamajorracialproblemonitshands.True,Britainisf
TheUnitedStateshasamajorracialproblemonitshands.True,Britainisf
TheBattleofWaterloowaswonbytheDukeofWellingtonoverthegreat______.A
JobworrieshelpedpushconsumerconfidencedowninSeptemberforthesecond
JobworrieshelpedpushconsumerconfidencedowninSeptemberforthesecond
[originaltext]ThousandsofveteransfromtheSecondWorldWarhavegathered
[originaltext]ThousandsofveteransfromtheSecondWorldWarhavegathered
InBritain,academicallytalentedpupilsnormallygotoforsecondaryeducation.
TheAmericanswonthewarofindependenceinthedecisivebattleat______.A、Bos
随机试题
[originaltext]Canada,fortheseventhconsecutiveyear,ranksasthebestplace
IfWintercomes,canSpringbefarbehindis_____famousverse.A、WilliamWords
MultilingualismontheInternetInrecentyears,America
钢管、钢板、钢带的热塑性粉末涂料双涂涂层厚度为()。A.0.15~0.50mm
颌下腺导管开口于() A.颌舌沟 B.舌下皱襞 C.舌下肉阜
请根据所提供的教材片段,设计1课时的教学简案。 要求: (1)写出一篇规范完
(一)针对考生试讲中的教学设计进行提问 这节课你的教学重点是什么?(《
根据()不同,金融期权可以分为欧式期权和美式期权。A.选择权的性质 B.买方
A.益气活血,化瘀通络 B.平肝息风,化痰祛瘀通络 C.息风清火,豁痰开窍,
在下列沟通协调内容中,属于施工现场内部沟通的是( )。A.设计单位图纸交付顺序
最新回复
(
0
)