首页
登录
职称英语
Going on computer may be the toughest job a remodeling contractor ever does
Going on computer may be the toughest job a remodeling contractor ever does
游客
2023-11-24
52
管理
问题
Going on computer may be the toughest job a remodeling contractor ever does. In order to make a conversion within a year, a company will need to make a major shakeup. This does not mean it will take a year to start using the computer for one function such as estimating, accounting, or word processing. The total conversion process will not be accomplished in a short period with little effort. A contractor in Indiana recently said he wished someone had warned him about how tough it was going to be. With an annual volume of more than $ 500,000 and a good staff in place he still had fear.
For effective use of the computer in a remodeling business, a complete change in methods of doing business usually is required. All management staff must get involved. Changes may include pre-selecting and standardizing products and systems. Developing specifications, changing the estimating system, and requiring more detailed information on time card. The list goes on and on. Without the support and active leadership of top management, this process, in all likelihood, will be fought by employees and will fail.
It is true that as computer can save money by stepping up the speed of estimating and making job costing, bookkeeping, and accounting more efficient. Word processing will certainly reduce time in typing contracts, writing letters, and so on. Still, most companies do not save money using the computer. Once they have mastered the basic computer operation, they become so enthralled with its ability to do other things they never considered when it was purchased.
The computer business is changing so fast that a company on computer will want to spend money on the latest hardware, newest software, and so on. That is the bad news. The good news is that the computer simply revolutionizes the company’ s ability to manage and innovate. The change in management methods, the ability to use numbers, and other new capabilities provide greater control over the company and allow it to grow and make more money. [br] In "they become so enthralled…"(Para 3), "enthralled" here means
选项
A、shocked
B、fascinated
C、puzzled
D、uncertain
答案
B
解析
词汇题,enthralled 在句中的意思为:着迷的.与fascinated 的意思最接近;
转载请注明原文地址:https://www.tihaiku.com/zcyy/3214031.html
相关试题推荐
Ifourbrainswerecomputers,we’dsimplyaddachiptoupgradeourmemory.
Ifourbrainswerecomputers,we’dsimplyaddachiptoupgradeourmemory.
Ifourbrainswerecomputers,we’dsimplyaddachiptoupgradeourmemory.
Ifourbrainswerecomputers,we’dsimplyaddachiptoupgradeourmemory.
Ifourbrainswerecomputers,we’dsimplyaddachiptoupgradeourmemory.
Ifourbrainswerecomputers,we’dsimplyaddachiptoupgradeourmemory.
ComputerCrimeI.IntroductionCurrentsituation:the
ComputerCrimeI.IntroductionCurrentsituation:the
ComputerCrimeI.IntroductionCurrentsituation:the
ComputerCrimeI.IntroductionCurrentsituation:the
随机试题
Laos,apoorcountryof6millionpeoplewedgedbetweenVietnamandThailand
Notsolongago,predictionmarkets(市场预测)werebeingconsideredasafanta
厄贝沙坦属于()。A:血管紧张素Ⅱ受体拮抗剂 B:肾上腺素α1受体拮抗剂
功效是利湿热,退黄疸的是A.猪苓 B.泽泻 C.萆薢 D.茵陈 E.茯苓
下列关于质量检验计划的表述有误的是()。 A.检验计划是产品生产者对整
加油加气站工艺设备应配置灭火器材,其中每2台加油机可配置1具()kg手提式干粉
某15层办公楼建筑,层高3m,下列防火检查结果符合现行国家工程建设消防技术标准的
以下选项不属于态度端正的表现是( )。A.认真学习 B.踏实肯干 C.
根据《建设工程工程量清单计价规范》(GB50500-2013),关于施工中工程
依据《注册安全工程师管理规定》,下列生产经营单位和安全生产中介机构配备注册安全工
最新回复
(
0
)