首页
登录
职称英语
Campfires twinkled on the beaches and along the causeways near Cape Kennedy.
Campfires twinkled on the beaches and along the causeways near Cape Kennedy.
游客
2023-11-22
9
管理
问题
Campfires twinkled on the beaches and along the causeways near Cape Kennedy. Nearly a million people had come to watch the launch of Apollo 11. Many had sweated in bumper-to-bumper traffic from Cocoa Beach to Titusville the night before. Even at 3 a.m. on this muggy Wednesday morning, the headlights of almost 300,000 cars cut through the dark-ness, intensifying the excitement. In 6.5 hours, NASA would launch three astronauts in mankind’s first attempt to land on the moon. It was an event no one wanted to miss.
In Firing Room I of the launch-control center, the liftoff team was supervising the hazardous loading of 2200 tons of super-cold liquid-oxygen (LOX) and liquid-hydrogen(LH2) propellants into the massive white pillar of Saturn V. Even at rates of up to 10,000 gallons a minute, the operation would take four hours and was so dangerous that the pad, usually crowded with work trucks and men in coveralls, had been ordered evacuated.
Hundreds of engineers and technicians were hunched over computer consoles, monitoring the thousands of separate systems aboard the three-stage booster and the Apollo spacecraft itself. The composite vehicle was heavier than a World War II destroyer. It contained six million parts and a total of 91 engines and motors, making it the most complex machine ever assembled. In theory all this machinery had to work perfectly if we were to succeed in our mission.
At 4:15 a. m., Deke Slayton, director of flight-crew operations, came to wake Neil Armstrong, Mike Collins and me. In our windowless quarters, we couldn’t tell if it was night or day, or if the weather had held for launch morning. But Deke had a sheath of flapping weather reports. "It’s a beautiful morning," he said. "You’ll go."
Deke and astronaut Bill Anders ate breakfast with us. They were friendly and talkative, but also somewhat distant. The three of us——Neil, Mike and I——were going. They were staying behind. [br] What type of writing is the written material?
选项
A、It is a story told by one of the flight crew of Apollo 11.
B、It is a news report filed by a correspondent on the spot.
C、It is a diary written by a member of the liftoff team.
D、It is a written statement presented to NASA
答案
A
解析
注意文中最后部分使用了第一人称,且根据“The three of us—Neil,Mike and I—were going”知“我”是三名登月宇航员之一。由此可知这是阿波罗11号登月宇航员之一讲述的故事。因此A为正确选项。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3209419.html
相关试题推荐
CampfirestwinkledonthebeachesandalongthecausewaysnearCapeKennedy.
CampfirestwinkledonthebeachesandalongthecausewaysnearCapeKennedy.
CampfirestwinkledonthebeachesandalongthecausewaysnearCapeKennedy.
CampfirestwinkledonthebeachesandalongthecausewaysnearCapeKennedy.
随机试题
Notice:Thissoftwareisdesignedtohelptheuserdeveloptheabilitytothi
CompletethediagrambywritingNOMORETHANTHREEWORDSinthebaresprovided.
下列属于扩张性货币政策操作的是()A.发行央行票据 B.降低法定存款准备金率
一心脏标本,肉眼观察见二尖瓣增厚变硬,瓣膜联合处粘连,主动脉瓣处有一瓣膜穿孔,另
商业银行的二级资本项目不包括()。A.二级资本工具及其溢价 B.超额贷款损
某有限责任公司2017年股改,股改前经审计净资产60000万元,拟以经审计净资产
关于施工过程施工质量控制的说法,正确的是( )。 A、工序施工效果的控制属于
2013年上半年,东部地区完成固定资产投资额是西部地区的多少倍?() A.
甲、乙、丙三国对某海域的划界存在争端,三国均为《联合国海洋法公约》缔约国。甲国在
在集团项目合伙人接受集团审计业务委托后,下列情形中,将导致集团项目组无法获取充分
最新回复
(
0
)