首页
登录
职称英语
The space shuttle Discovery completed a ______ mission upon its return to Kenned
The space shuttle Discovery completed a ______ mission upon its return to Kenned
游客
2023-11-11
47
管理
问题
The space shuttle Discovery completed a ______ mission upon its return to Kennedy Space Centre.
The space shuttle Discovery made a rare night landing at the Kennedy Space Centre early on Thursday. The night landing, the 11th in the Centre’s 94 shuttle missions, ended a 10-day mission to outfit the orbiting International Space Station.
Although the spacecraft created a sonic boom that could be heard along much of Florida’s eastern seaboard, witnesses on the ground could not see the orbiter until it was directly over the runway lights.
Scattered showers off the Florida coast had threatened to postpone the shuttle’s return, but forecasters gave the green light when they decided no rain would fall within 48 kilometres of the space center.
选项
A、I 1-day
B、94-day
C、10-day
D、49-day
答案
D
解析
只有D选项在报道中示曾提及,因此为正确答案。
转载请注明原文地址:https://www.tihaiku.com/zcyy/3179105.html
相关试题推荐
Whatdiscoverywasthebasisofphotography?[br][originaltext]Thecamera
Whatdiscoverywasthebasisofphotography?[br][originaltext]Thecamera
Whatdiscoverywasthebasisofphotography?[originaltext]Thecameraisoft
ThemissionoftheteamU.N.Secretary-GeneralKofiAnnanintendedtosendtoIs
Howmanystudentsreceivedanadmissione-mailfromtheUniversityofCalifornia
Fitzgeralddecidedtoreturnhome,becausethelongerhestayedhere,A、hewould
Thesoldierfoundhimself______aherowhenhereturnedtohisvillage.A、someon
TheUNcommissionofinquiryonEastTimorhasfoundevidencethat______.[br]
TheUNcommissionofinquiryonEastTimorhasfoundevidencethat______.[br]
TheUNcommissionofinquiryonEastTimorhasfoundevidencethat______.[orig
随机试题
JustastheCorporatecowboysofthe1970sdestroyedthereputationofthe
淋巴细胞的体积为( )。A.230×10L B.16×10L C.87×1
Shayasked,"Doyouthinkthey'llletme
采用高温法杀灭热原的条件只需A.100℃加热20min以上,可破坏热原B.100
下面表述中不是资产基本特征的项目是()。A.资产预期会给企业带来经济利益
某松散砂土地基e0=0.85;emax=0.90;emin=0.55
期货交易采用的结算方式是()。A.一次性结清 B.货到付款 C.分期付款
绿豆汤罐头,由绿豆煮熟并加糖制成
下列事件的发生,已经或将造成工期延误,则按照《标准施工招标文件》中相关合同条件,
现浇钢筋混凝土预应力箱梁模板支架刚度验算时,在冬期施工的荷载组合包括()。A.
最新回复
(
0
)