首页
登录
职称英语
London’s public transport system is no longer the "sick man" but the jewel i
London’s public transport system is no longer the "sick man" but the jewel i
游客
2023-10-21
60
管理
问题
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bid chiefs said last night.
Transport experts told the International Olympic Committee scrutinizing Britain’s chances that London’s railways and roads would soon be the envy of the world.
Once improvements were in place, athletes would spend time "competing not commuting", bid leader Lord Coe told the IOC panel on the first day of their visit.
The need for an overhaul came after the IOC criticised London’s " obsolete" public transport systems in a report last May.
Yesterday the London 2012 bid made a series of promises including;
£ 10 billion of investments including a £ 1 billion East London line extension, longer Jubilee line trains and Northern line upgrades.
A train serving the main Olympic Park at Stratford, East London, every 15 seconds, on ten different rail lines.
Twelve-carriage, 225kph (140mph) javelin trains using the Channel Tunnel Rail Link and taking passengers between Straford and King’s Cross in six-and-a-half minutes.
Tube trains running until 2:30 a. m. every day of the Olympics.
Connecting services which will allow visitors to reach the Olympic Park from 309 stations.
The 13-member IOC panel will today have its first taste of the Underground, with a Jubilee line trip to the Millennium Dome. They will also travel on the Channel Tunnel Rail Link, watching a video outlining the transport improvements to be delivered every year up to 2012.
But they will spend most of their time on coaches as they travel to such key sites as Wembley and Wimbledon.
Transport Minister Tony McNulty admitted there were concerns about how London would cope with 500, 000 extra visitors a day. But Transport for London said the Olympic fortnight in August would lead to only a five percent increase in passengers—when 20 percent of London’s commuters were on holiday. Questions: [br] The need for an overhaul came because of a report given by the______.
选项
答案
International Olympic Committee(IOC)
解析
(文章第四段提到The need for an overhaul came after the IOC criticised London’s“obsolete”public transport systems in a report,在一次报道中IOC批评了伦敦的交通系统,IOC是International Olympic Committee的缩写。)
转载请注明原文地址:https://www.tihaiku.com/zcyy/3117345.html
相关试题推荐
Thepublicopinionwasthatthetimewasnot________fortheelectionofsucha
Thegovernment________apublicdebateonthefuturedirectionoftheofficialsp
Thissortofrudebehaviourinpublichardly________apersoninyourposition.A、
ThearchitectoftheWalkieTalkiebuildinginLondonhasadmittedthathep
My________concertwasasuccess.A、brother’slongfirstpublicB、brother’sfirst
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
随机试题
"DoyouwanttoseemyIDcardormydriver’slicense?""______willdo."A、Ever
Alanarguedthatthebestteachersshouldberewardedwithsalariesonaparwit
[originaltext]Afteragenerationofno-faultdivorceinAmerica,law-makers
Asubjectwhichseemstohavebeeninsufficientlystudiedbydoctorsandpsy
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
Today,therearemanyavenuesopentothosewhowishtocontinuetheireduca
对于实际能力已达不到《等级证书》能力等级的检测机构,质监机构应当立即给予注销《等
在理财规划书的制作过程中,理财目标的评估和分析这部分的内容不包括()。A.全生
与设备器壁之间结合均匀且牢固,没有间隙,传热性好,适用于负压、回转运动和振动下工
A.3"→5" B.5"→3" C.N端→C端 D.C端→N端 E.C端
最新回复
(
0
)